background image

 

 

Installation: 

 
1.  Screw the studded rod (G) into the base of the tap (A). 

 

2.  Place the base column locator (B) then the base column (C) on the bottom of the tap (A) 

 

3.  Screw the hot & cold water flexible pipes (K & L) into the base of the tap 

 

4.  Place the base plinth (D) then upper seal (E) onto the base column (C) 

 

5.  Place the mixertap (A) onto the sink, passing the flexible tail pipes (K & L) and studded rod (G) through the taphole. 

 

6.  If fitting the tap to a stainless steel sink the white triangular stabiliser (F) can be placed where shown to help to stabilise the weight 

of the tap. 

 

7.  Pass the rubber and then metal horseshoe (H & I) over the studded rod (G) and around the tail pipes (K & L). 

 

8.  Fasten the fixing nut (J) securely onto the fixing stud (G) to fix the tap into its correct location. 

 

9. 

Connect the hot and cold tail pipes (K & L) to the water mains using ½” BSPx15mm compression fittings.

 

 

 

 

Key: 

Description: 

Qty. 

 

Tap body 

 

Base column locator 

 

Base column 

 

Base plinth 

 

Upper foam seal

 

 

White triangular stabiliser

  

(for stainless steel sinks only) 

 

Fixing stud 

 

Rubber horseshoe 

 

Metal horseshoe 

 

Fixing nut 

 

Hot water flexible inlet pipe 

(with integral non return valve)

 

 

Cold water flexible inlet pipe 

(with integral non return valve)

 

 

 
After installation: 

 

Once you have visually checked the installation of the new 
tap and all connections, ensure that all other fittings are 
closed except the new tap which should be left open.  
 
Turn on your water heating system and ensure that your 
mains stopcock is open. Reconnect both the hot and cold 
water supplies to this fitting. 
 
Check the function of flow and function of hot, cold and 
mixed water. 
 
Turn off the tap and check carefully for any leaks around all 
connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to 
double check for slower leaks. If pressure testing 
equipment is available check the installation to the 
maximum recommended pressure. 
 
Clean the tap to remove any marks created during 
installation as instructed then place a bag over the product 
to protect the tap until it is ready for use. 
 
The installation should be periodically checked for damage, 
if the property is left unattended for a prolonged period we 
recommend isolating water supplies. 
 

 

 

 

 

Отзывы: