
5.REMOVAL OF THE DD MOTOR AND START/STOP PCB DIP ASSEMBLY AND
TOGGLE
SWITCH PCB DIP ASSEMBLY AND
RIGHT PCB ASSEMBLY(SMT/DIP) AND LEFT PCB
ASSEMBLY(DIP) AND RIHGT FRONT PCB DIP ASSEMBLY AND FSR PCB
ASSEMBLY(SMT). (Fig.5)
(A) REMOVE THE 8 PCS SCREWS AND 6 PCS WASHER AND 2 PCS
WASHER EXTERNAL BEFORE
REMOVAL OF
DD MOTOR.
(B) REMOVE THE 12 PCS SCREWS AND 4 PCS CONNECTOR BEFORE REMOVAL OF START/STOP PCB
DIP AND
TOGGLE SWITCH PCB DIP ASSEMBLY.
(C) REMOVE THE 60 PCS SCREWS AND 4 PCS CONNECTOR AND 8 PCS COPPER BEFORE REMOVAL OF
RIGHT PCB ASSEMBLY(SMT/DIP) AND
LEFT PCB ASSEMBLY(DIP) AND
RIHGT FRONT PCB DIP
ASSEMBLY.
(D) REMOVE THE 2 PC CONNECTOR BEFORE REMOVAL OF FSR PCB ASSEMBLY(SMT).
Fig.5
Содержание NK49
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......