Preparing for Use
R&S
®
SGT100A
22
User Manual 1176.8674.02 ─ 07
To connect the AC supply
► Connect the R&S
SGT to the AC power source using the AC power cable delivered
with the instrument.
Note:
The instrument is in compliance with safety class EN61010-1.
Connect the instrument only to a socket with earthing contact.
To start up the instrument
1.
Connect the instrument to the AC supply.
2. To turn on the power, press the main power switch to position I (On).
To switch between standby and ready state
► Press the POWER ON/STAND BY key briefly to switch the instrument from the
standby to ready state or vice versa.
In ready state, the button is green. The instrument is ready for operation. All mod-
ules are power-supplied and the R&S
SGT initiates its startup procedure.
In standby state, the button is orange. The standby power only supplies the power
switch circuits and built-in oscillator to keep it at its operating temperature. The
remote control system is
not
active.
Start-up and booting
The instrument boots the operating system and starts the instrument firmware. During
the booting process, the green POWER ON/STAND BY key blinks. If the previous ses-
sion was terminated regularly, the instrument uses the last setup with the relevant
instrument settings.
Once the startup procedure has been terminated, the instrument is ready for operation.
In the R&S SGMA-GUI, select "Instrument > Preset" function to return the instrument
to its defined reset/preset state, if the current setup is no longer relevant.
To customize the start settings, use the "SGMA-GUI > File > Save As/Open" function.
Putting into Operation