Preparing for use
R&S
®
ZCxxx
9
Getting Started 1177.5156.02 ─ 05
3
Preparing for use
Here, you can find basic information about setting up the product for the first time.
3.1
Unpacking and checking
When you receive the converter, please take the following steps:
1. Unpack the converter and the other contents from the cardboard shipping box.
2. Retain the original packing material. Use it when transporting or shipping the
product later.
3. Using the delivery notes, check the equipment for completeness.
The shipment must include the following items:
● Converter
● DC supply cable
● USB cable
● IF cable EXT REF
● IF cable EXT MEAS
● External attenuator control cable (R&S
ZC90E only)
● Plastic case with 8 flange screws 4-40 UNC 7.6 and 4 flange screws 4-40
UNC 9.24
● Plastic case with 8 precision dowels 1.566
mm ± 0.001
mm
● 3/32” hex ball driver
● Getting Started (this document)
4. Inspect the frequency converter, especially the test port adapter and the test
port flange surface, to make sure that no damages occurred during shipment.
If you observe any damages, immediately notify the shipping company and
keep the packing material.
Unpacking and checking