![R&M LOADMATE LM 16 Скачать руководство пользователя страница 3](http://html2.mh-extra.com/html/randm/loadmate-lm-16/loadmate-lm-16_installation-and-maintenance-instructions-manual_3079438003.webp)
®
R&M Materials Handling, Inc
LoadMate®
Chain Hoist
Springfield, Ohio USA
LM16-20-25 Manual
: 800 955-9967
April 2005
www.rmhoist.com
April 1, 2005
ii
LM16-20-25-I&M
MANUAL-2005-0
TABLE OF CONTENTS
1
INTRODUCTION...................................................................................................... 1
1.1
Contact Information .......................................................................................................1
1.2
Warranty........................................................................................................................1
1.3
Disclaimer......................................................................................................................1
1.4
Safety ............................................................................................................................2
1.5
Placards and Instructions ..............................................................................................4
2
INSTALLATION........................................................................................................ 5
2.1
General..........................................................................................................................5
2.2
Chain Container Installation ..........................................................................................5
2.3
Lubrication.....................................................................................................................5
2.4
Mounting........................................................................................................................6
2.5
Load Hook Throat Opening ...........................................................................................6
2.6
Electrical Connection ....................................................................................................6
2.7
Three Phase Power Connections..................................................................................7
3
INITIAL START-UP .................................................................................................. 8
3.1
General..........................................................................................................................8
3.2
Correcting the Direction of Hook Travel ........................................................................8
3.3
Operational Checks – No Load .....................................................................................8
3.4
Operational Checks – With Load...................................................................................9
4
HOIST OPERATION .............................................................................................. 10
5
MAINTENANCE ..................................................................................................... 12
5.1
Construction ................................................................................................................12
5.2
Hoist Motor and Brake Assembly ................................................................................13
5.3
Torque Limiter (Refer to Figure 5.4)............................................................................17
5.4
Load Chain ..................................................................................................................18
5.5
Maintenance Inspection ..............................................................................................18
5.6
Load Chain Specifications (see Figure 5.5) ................................................................20
5.7
Removing the Load Chain...........................................................................................20
5.8
Installing the Load Chain.............................................................................................21
5.9
Fall Stop Assembly (Refer to Figure 5.8) ....................................................................22
5.10
Chain Container ..........................................................................................................23
5.11
Upper and Lower Travel Safety Limit Switch ..............................................................24
5.12
Upper and Lower Rotary Travel Limit Switch ..............................................................24
5.13
Hooks ..........................................................................................................................25
5.14
Hook Inspection ..........................................................................................................25
5.15
Hook Dimensions ........................................................................................................26
5.16
Top Hook.....................................................................................................................27
5.17
Controls .......................................................................................................................28
5.18
Two Speed – Three Phase – 208 / 230 / 460 Volt – Power Circuit .............................30
5.19
Two Speed – Three Phase – 208 / 230 / 460 Volt – Control Circuit............................31
5.20
Two Speed – Three Phase – 208 / 230 / 460 Volt – Push Button...............................32
5.21
Two Speed – Three Phase – 575 Volt – Power Circuit ...............................................33
5.22
Two Speed – Three Phase – 575 Volt – Control Circuit..............................................34
5.23
Two Speed – Three Phase – 575 Volt – Push Button.................................................35
6
PREVENTATIVE MAINTENANCE ......................................................................... 37
6.1
Maintenance and Inspection Table .............................................................................37