Page 12
Refrigerant Piping Connection
7
Safety Precautions
WARNING
•
All field piping must be completed by a
licensed technician and must comply with
local and national regulations.
•
When the air conditioner is installed in a small
room, measures must be taken to prevent the
refrigerant concentration in the room from
exceeding the safety limit in the event of
refrigerant leakage. If the refrigerant leaks
and its concentration exceeds its proper limit,
hazards due to lack of oxygen may result.
•
When installing the refrigeration system,
ensure that air, dust, moisture, or foreign
substances do not enter the refrigerant circuit.
Contamination in the system may cause poor
operating capacity, high pressure in the
refrigeration cycle, explosion, or injury.
•
Ventilate the area immediately if there is
refrigerant leakage during the installation.
Leaked refrigerant gas is both toxic and
flammable. Ensure there is no refrigerant
leakage after completing the installation work.
Refrigerant Piping
Connection
Refrigerant Piping Connection Instructions
CAUTION
•
The branching pipe must be installed
horizontally. An angle of more than 10° may
cause malfunction.
•
DO NOT
install the connecting pipe until both
the indoor unit and the outdoor unit have
been installed.
•
Insulate the gas and liquid piping to
prevent water leakage.
Step1: Cut pipes
When preparing refrigerant pipes, take extra
care to cut and flare them properly. This will
ensure efficient operation and minimize the
need for future maintenance.
1. Measure the distance between the indoor
and outdoor units.
2. Using a pipe cutter, cut the pipe a little
longer than the measured distance.
CAUTION
DO NOT
deform pipe while cutting. Be extra
careful not to damage, dent, or deform the pipe
while cutting. This will drastically reduce the
heating efficiency of the unit.
1. Make sure the pipe is cut at a perfect
90° angle. Refer to Fig. 7.1 for examples of
bad cuts.
Oblique
Rough
Warped
90°
Fig. 7.1
Step 2: Remove burrs
Burrs can affect the air-tight seal of the refrigerant
piping connection. They must be completely
removed.
1. Hold the pipe at a downward angle to
prevent burrs from falling into the pipe.
2. Using a reamer or deburring tool, remove
all burrs from the cut section of the pipe.
Pipe
Reamer
Point down
Fig. 7.2
Step 3: Flare pipe ends
Proper flaring is essential to achieve an airtight seal.
1. After removing burrs from the cut pipe, seal
the ends with PVC tape to prevent foreign
materials from entering the pipe.
2. Sheath the pipe with insulating material.
3. Place flare nuts on both ends of the pipe.
Make sure they are facing in the right
direction because you can’t put them on
or change their direction after flaring
(see Fig. 7.3).
Flare nut
Copper pipe
Fig. 7.3
Содержание CHDZ-24-12-12
Страница 18: ...Page 18 Wiring One five models Model A Model B Model C Model D Model E Model F Model G...
Страница 24: ......
Страница 27: ...Page 3 Troubleshooting 10 a Common Problems 10 b Troubleshooting Tips 11 4...
Страница 38: ......
Страница 39: ......
Страница 40: ......