COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
Page 30 - Operation
Operation
455
2. Stop the carrier engine. Operate boom and hammer controls to release pressure
trapped inside hoses. Wait ten minutes for oil pressure to drop.
3. Close hammer inlet and outlet lines. If quick couplers are used, disconnection
automatically closes hammer lines. If hammer line includes ball valves, please
make sure that they are closed.
4. Disconnect hoses. Protect environment from oil spills. Plug the hoses and the
hammer inlet and outlet ports.
5. Remove bucket pins and other parts.
6. The carrier can be moved aside.
INSTALLATION
1. Install hammer in the same manner as mounting a bucket. Install bucket pins.
2. Connect hoses. Hammer inlet port is marked with "IN" and outlet port with
"OUT". In the installation inspection certain specifications (operating pressure,
oil flow, etc.) are checked so that they are within given limits. See “Hammer
specifications” on page 54.
3. Open hammer inlet and outlet lines.
Содержание 455
Страница 1: ...Original instructions 1 13 OPERATOR S MANUAL OM455ENG 113 HYDRAULIC HAMMER RAMMER 455 ...
Страница 3: ...Operation Page 3 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 OPERATION ...
Страница 33: ...Lubrication Page 33 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 LUBRICATION ...
Страница 41: ...Maintenance Page 41 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 MAINTENANCE ...
Страница 53: ...Specifications Page 53 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY 455 SPECIFICATIONS ...
Страница 58: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 58 ...
Страница 59: ...Page 59 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...