background image

B

TENSION ADJUSTMENT

RAM® QUICK DRAW™ ASSEMBLY INSTRUCTIONS (SIDE A)

STEP 1

STEP 2

RMR-INS-QDJRBS

RAM Mounting Systems

8410 Dallas Ave S
Seattle, WA 98108
Phone: (206) 763-8361
Fax: (206) 763-9615
www.rammount.com
[email protected] 

PARTS INDEX:

A. RAM® QUICK DRAW™ (QTY. 1)
B. DOCKING CUP (QTY. 1)
C. TOP CUP (QTY. 1)
D. #6-32 X ½” MACHINE SCREW (QTY. 8)
E. #6-32 NYLOCK NUT (QTY. 8)

SUGGESTED TOOLS:

5/6” HEX WRENCH
#2 PHILIPS HEAD SCREWDRIVER

STEP 1 - ATTACH TOP CUP

ATTACH (C) TOP CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO 
THAT OPENING OF TOP CUP FACES THE LENGTH OF THE QUICK DRAW AS SHOWN. 
SCREWS SHOULD BE INSERTED UPWARD TOWARDS (C) TOP CUP.

STEP 2 - ATTACH DOCKING CUP

ATTACH (B) DOCKING CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO 
THAT DEVICE EXTENDS THE (C) TOP CUP ½”  TO 1” WHILE DOCKED (SEE TENSION 
ADJUSTMENT). SCREWS SHOULD BE INSERTED DOWNWARD TOWARDS QUICK DRAW SPINE.

TENSION ADJUSTMENT

THE PLACEMENT OF THE (B) DOCKING CUP CAN BE ADJUSTED TO FIT VARIOUS ACCESSORIES. SLOTTED HOLES ALONG (A) QUICK DRAW™ SPINE ALLOW SCREWS 
AND NUTS TO BE ATTACHED TO ADJUST FOR VARIOUS HEIGHTS. THE GOAL IS TO PROVIDE SPRING TENSION, BASED ON THE OVERALL LENGTH OF THE DEVICE, 
INCLUDING ATTACHED ACCESSORIES. IT IS IMPORTANT TO ADJUST DOCK SO THAT DEVICE HAS ADEQUATE SPRING TENSION TO FORCE (C) TOP CUP AND DEVICE 
DOWN ONTO THE (B) DOCKING CUP. THIS IS CRITICAL FOR PROPER FUNCTIONALITY. DEVICE SHOULD NOT SHAKE OR RATTLE WHILE DOCKED.

DOCKING CUP AND TOP CUP MAY 
VARY BASED ON HAND-HELD DEVICE.

A

B

C

D

E

B

TENSION ADJUSTMENT

RAM® QUICK DRAW™ ASSEMBLY INSTRUCTIONS (SIDE A)

STEP 1

STEP 2

RMR-INS-QDJRBS

RAM Mounting Systems

8410 Dallas Ave S
Seattle, WA 98108
Phone: (206) 763-8361
Fax: (206) 763-9615
www.rammount.com
[email protected] 

PARTS INDEX:

A. RAM® QUICK DRAW™ (QTY. 1)
B. DOCKING CUP (QTY. 1)
C. TOP CUP (QTY. 1)
D. #6-32 X ½” MACHINE SCREW (QTY. 8)
E. #6-32 NYLOCK NUT (QTY. 8)

SUGGESTED TOOLS:

5/6” HEX WRENCH
#2 PHILIPS HEAD SCREWDRIVER

STEP 1 - ATTACH TOP CUP

ATTACH (C) TOP CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO 
THAT OPENING OF TOP CUP FACES THE LENGTH OF THE QUICK DRAW AS SHOWN. 
SCREWS SHOULD BE INSERTED UPWARD TOWARDS (C) TOP CUP.

STEP 2 - ATTACH DOCKING CUP

ATTACH (B) DOCKING CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO 
THAT DEVICE EXTENDS THE (C) TOP CUP ½”  TO 1” WHILE DOCKED (SEE TENSION 
ADJUSTMENT). SCREWS SHOULD BE INSERTED DOWNWARD TOWARDS QUICK DRAW SPINE.

TENSION ADJUSTMENT

THE PLACEMENT OF THE (B) DOCKING CUP CAN BE ADJUSTED TO FIT VARIOUS ACCESSORIES. SLOTTED HOLES ALONG (A) QUICK DRAW™ SPINE ALLOW SCREWS 
AND NUTS TO BE ATTACHED TO ADJUST FOR VARIOUS HEIGHTS. THE GOAL IS TO PROVIDE SPRING TENSION, BASED ON THE OVERALL LENGTH OF THE DEVICE, 
INCLUDING ATTACHED ACCESSORIES. IT IS IMPORTANT TO ADJUST DOCK SO THAT DEVICE HAS ADEQUATE SPRING TENSION TO FORCE (C) TOP CUP AND DEVICE 
DOWN ONTO THE (B) DOCKING CUP. THIS IS CRITICAL FOR PROPER FUNCTIONALITY. DEVICE SHOULD NOT SHAKE OR RATTLE WHILE DOCKED.

DOCKING CUP AND TOP CUP MAY 
VARY BASED ON HAND-HELD DEVICE.

A

B

C

D

E

Отзывы: