B
TENSION ADJUSTMENT
RAM® QUICK DRAW™ ASSEMBLY INSTRUCTIONS (SIDE A)
STEP 1
STEP 2
RMR-INS-QDJRBS
RAM Mounting Systems
8410 Dallas Ave S
Seattle, WA 98108
Phone: (206) 763-8361
Fax: (206) 763-9615
www.rammount.com
[email protected]
PARTS INDEX:
A. RAM® QUICK DRAW™ (QTY. 1)
B. DOCKING CUP (QTY. 1)
C. TOP CUP (QTY. 1)
D. #6-32 X ½” MACHINE SCREW (QTY. 8)
E. #6-32 NYLOCK NUT (QTY. 8)
SUGGESTED TOOLS:
5/6” HEX WRENCH
#2 PHILIPS HEAD SCREWDRIVER
STEP 1 - ATTACH TOP CUP
ATTACH (C) TOP CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO
THAT OPENING OF TOP CUP FACES THE LENGTH OF THE QUICK DRAW AS SHOWN.
SCREWS SHOULD BE INSERTED UPWARD TOWARDS (C) TOP CUP.
STEP 2 - ATTACH DOCKING CUP
ATTACH (B) DOCKING CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO
THAT DEVICE EXTENDS THE (C) TOP CUP ½” TO 1” WHILE DOCKED (SEE TENSION
ADJUSTMENT). SCREWS SHOULD BE INSERTED DOWNWARD TOWARDS QUICK DRAW SPINE.
TENSION ADJUSTMENT
THE PLACEMENT OF THE (B) DOCKING CUP CAN BE ADJUSTED TO FIT VARIOUS ACCESSORIES. SLOTTED HOLES ALONG (A) QUICK DRAW™ SPINE ALLOW SCREWS
AND NUTS TO BE ATTACHED TO ADJUST FOR VARIOUS HEIGHTS. THE GOAL IS TO PROVIDE SPRING TENSION, BASED ON THE OVERALL LENGTH OF THE DEVICE,
INCLUDING ATTACHED ACCESSORIES. IT IS IMPORTANT TO ADJUST DOCK SO THAT DEVICE HAS ADEQUATE SPRING TENSION TO FORCE (C) TOP CUP AND DEVICE
DOWN ONTO THE (B) DOCKING CUP. THIS IS CRITICAL FOR PROPER FUNCTIONALITY. DEVICE SHOULD NOT SHAKE OR RATTLE WHILE DOCKED.
DOCKING CUP AND TOP CUP MAY
VARY BASED ON HAND-HELD DEVICE.
A
B
C
D
E
B
TENSION ADJUSTMENT
RAM® QUICK DRAW™ ASSEMBLY INSTRUCTIONS (SIDE A)
STEP 1
STEP 2
RMR-INS-QDJRBS
RAM Mounting Systems
8410 Dallas Ave S
Seattle, WA 98108
Phone: (206) 763-8361
Fax: (206) 763-9615
www.rammount.com
[email protected]
PARTS INDEX:
A. RAM® QUICK DRAW™ (QTY. 1)
B. DOCKING CUP (QTY. 1)
C. TOP CUP (QTY. 1)
D. #6-32 X ½” MACHINE SCREW (QTY. 8)
E. #6-32 NYLOCK NUT (QTY. 8)
SUGGESTED TOOLS:
5/6” HEX WRENCH
#2 PHILIPS HEAD SCREWDRIVER
STEP 1 - ATTACH TOP CUP
ATTACH (C) TOP CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO
THAT OPENING OF TOP CUP FACES THE LENGTH OF THE QUICK DRAW AS SHOWN.
SCREWS SHOULD BE INSERTED UPWARD TOWARDS (C) TOP CUP.
STEP 2 - ATTACH DOCKING CUP
ATTACH (B) DOCKING CUP TO (A) QUICK DRAW™ USING 4 (D) SCREWS AND 4 (E) NUTS SO
THAT DEVICE EXTENDS THE (C) TOP CUP ½” TO 1” WHILE DOCKED (SEE TENSION
ADJUSTMENT). SCREWS SHOULD BE INSERTED DOWNWARD TOWARDS QUICK DRAW SPINE.
TENSION ADJUSTMENT
THE PLACEMENT OF THE (B) DOCKING CUP CAN BE ADJUSTED TO FIT VARIOUS ACCESSORIES. SLOTTED HOLES ALONG (A) QUICK DRAW™ SPINE ALLOW SCREWS
AND NUTS TO BE ATTACHED TO ADJUST FOR VARIOUS HEIGHTS. THE GOAL IS TO PROVIDE SPRING TENSION, BASED ON THE OVERALL LENGTH OF THE DEVICE,
INCLUDING ATTACHED ACCESSORIES. IT IS IMPORTANT TO ADJUST DOCK SO THAT DEVICE HAS ADEQUATE SPRING TENSION TO FORCE (C) TOP CUP AND DEVICE
DOWN ONTO THE (B) DOCKING CUP. THIS IS CRITICAL FOR PROPER FUNCTIONALITY. DEVICE SHOULD NOT SHAKE OR RATTLE WHILE DOCKED.
DOCKING CUP AND TOP CUP MAY
VARY BASED ON HAND-HELD DEVICE.
A
B
C
D
E