rako RAK8 Скачать руководство пользователя страница 3

 

Installation:  

 

Step 1

 - Secure metal box housing to wall or secure mounting position. The RAK8 system 

relies on being vertically mounted to allow the ventilation system to work properly. 

Step 2

 - If multiple RAK8s are to be joined to form a larger ‘stack’ mount and join the other 

cases to join the original case using the connecting grommets (see picture overleaf) cutting 
away enough plastic to allow cable access. 

Step 3

 - Bring a separate 10A MCB protected supply to each RAK8 case. Leave the supply 

Live, Neutral and earth ready to connect to the circuit board supply.  

Step 4

 - Bring all lighting feeds for this RAK8 into the case and connect the Neutrals and 

Earths to the appropriate bus bars leaving the Lives and any control cables ready for 
connection to the circuit board.  

Step 5

 - Secure the circuit tray mounted motherboard into position using the two fixing 

screws supplied and connect the Supply (L,N&E).  

Step 7

 - Connect the Lives to the appropriate output terminals.  

NB 

If daughterboards are not yet to be fitted the Aux 230V outputs can be used for testing.  

Step 8

 - On multiple assemblies of RAK8s link the circuit boards using the interconnecting 

leads supplied, plugging them into the IN/OUT RJ45 sockets. The system interface (RxLink 
for wireless, or RAKLink for wired networks) should then plug into one of the remaining 
IN/OUT sockets. 

Step 9 

- Plug the daughter board modules into the motherboard according to required 

lighting specifications.  

Step 10

 – Fit Lid. 

 
 
 
 
 

Отзывы: