PRE-LINING INSTALLATION

•  Fit wall bracket according to manufacturers instructions ensuring the through  

wall fixing bolts are set to a height to allow the pan to meet the height required 
for the contract.

•  Ensure through wall bolts are at the correct spacing to suit the WC mounting holes.
•  Complete installation of inwall cistern or flushing valve to manufacturers 

specification allowing the horizontal pipe to extend sufficiently to meet the  
pan horn.

POST-LINING INSTALLATION

• Trim horizontal flush pipe as necessary and fit Kee seal.
• If mounting frame is supplied with tile insulation panel, fit to wall.
• Slide WC onto fixing bolts and water/waste pipes, tighten nuts and fit covers.
• Trim around tile insulation panel with sharp craft knife.
• Apply bead of flexible mould resistand silicon around WC.
•  Where inwall cistern has been used, flush line thoroughly before final connection 

to cistern according to manufacturers instructions.

• Where inwall flush valve has been installed, remove internals of flush valve and 
   open stop cock to flush debris/air from flushing line for at least 1 minute, 
   reassemble and test flush.

• Toilet fixing kit - RA-GL08K