background image

EV 200 KU 
MANUAL

To remove the trolley from under the seat:
1) Lift off the top of the seat
2) Raise the connection tube
3) Lift up the ventilation connection
4) Pull the trolley backwards
5) Remove the liquid pipe
 

INSTALLATION

 

1) 1) Seat, connecting pipe and trolley (van)

A tank-shaped opening is sawn into the floor and back wall. If 
necessary, use a level under the tank, a suitable seat height is 43-
50 cm. The trolley's space requirements are - 92 cm height and 
80 with x 60 cm deep. The space requirement for the toilet space 
is 50 (W) x 70 (W) cm, we recommend a larger toilet space, eg 100 
(W) x 100 (W) cm.
The trolley is removed through an opening, hatch or door (for 
emptying). If the toilet is used in winter, insulate the room and (if 
necessary) install heating (purchased separately - min. +10 
degrees C thermostatically controlled). Insulation (eg 50 mm)  
base, walls, door or door. The liquid pipe is insulated.
Connecting pipe (diameter 20 cm - 50 cm, longer are also 
available) is shortened depending on the installation site.
 

2. Ventilation

The ventilation pipe (D110) is led out. The end of the pipe must 
be 60 cm above the ceiling. The delivery includes coupling part 
D75 mm> 110 mm (+), and 110 pipe cap (-). Other necessities 
are purchased separately (straight pipes and any 30-degree 
angles). We recommend that the replacement air is taken into 
the toilet from the outside. All air that leaves the room passes 
through the ventilation. For winter use, we recommend 
insulating the pipe in cold rooms.

3. Fluid pipe connection

Connect the liquid pipe (D32) to the tank or drain (0.7 m on 
delivery, supply air branch and filter and 90 degree angle, extra 
pipe if required). Excess liquid (installation method; ECO or 
ECOSEP) is discharged into the drain with washing and rinsing 
water (7). It can also be led to a separate biofilter and infiltrated 
to the ground. It can also be collected (5) in a separate container 
(20 l container included) or in a tank (6).
Separated urine (installation method SEP; delivery includes 
separating seat outlet (D32 +), 1.5 m 32 hoses and bushing) is 
collected in a separate container (20 l container is included in 
delivery or tank (6)).
For winter use, we recommend insulation / heating of the liquid 
pipe in the cold room.

Содержание EV 200 IS

Страница 1: ...hoito huolto Kiitos ett valitsit EV 200 KU BioK ym l n Ennen asennusta lue n m ohjeet Jos sinulla on kysymyksi joihin et l yd vastauksia n ist ohjeista soita numeroon 358 400 912111 tai l het s hk po...

Страница 2: ...0 putken hattu Muut tarvittavat hankitaan erikseen suora putki ja mahdolliset 30 asteen kulmakappeleet Suosittelemme korvausilman ottoa wc tilaan ulkoa Kaikki huoneesta poistuva ilma kulkee ilmastoint...

Страница 3: ...masta ja 40 orgaanisesta kuormasta Kun k ym l j te k sitell n EV 200KUssa saavutetaan tiukimmat puhdistusvaatimukset vaivattomasti 2 EV 200KUn hoidon toimenpiteet Panosta EV 200 KU k ytt notettaessa o...

Страница 4: ...keita sahanpurua puunlastua ym Muita aineita k ytett ess hoito ja mitoitus voivat vaihdella normaalista Toimenpiteet ennen k ytt my s tyhjennyksen j lkeen Panosta 1 2 cm Drymix kompostirouhetta kompos...

Страница 5: ...Tarkista massan kosteus ilmastointiputki lis seosainetta K rp si kompostis ili ss Syy Ei putkihattua seosainetta ei ole k ytetty riitt v sti Hoito toimenpide Asenna putkihattu ja k yt riitt v sti seo...

Страница 6: ...allation sk tsel underh ll Tack f r att du valde EV 200 KU BioToilet L s dessa instruktioner f re installation Om du har ytterligare fr gor som inte besvaras i dessa instruktioner ring 358 400 912111...

Страница 7: ...raka r r och eventuella 30 graders vinklar Vi rekommenderar att ers ttningsluften tas in i toaletten utifr n All luft som l mnar rummet passerar genom ventilationen Vid vinterbruk rekommenderar vi iso...

Страница 8: ...enisktoch milj v nligt Toalettavfall Toalettavfall best r av avf ring urin och toalettpapper Den inneh ller organiska och oorganiska mnen fasta mnen mikroorganismer olika bakterier och virus Att leda...

Страница 9: ...erial kan sk tsel och kapacitet variera fr n det normala tg rder f re anv ndning ven efter t mningen Placera 1 2 cm Drymix p botten av komposteringskammaren ECO ECO SEP 1 Fyll i biofilterutrymmet ECO...

Страница 10: ...a avfallet Flugor i komposten Anledning Inget ventilation hat otillr cklig blandning inte tillr ckligt str material i komposten tg ra Installera ett ventilationshat och anv nd tillr ckligt med str mat...

Страница 11: ...ion care maintenance Thank you for choosing the EV 200 KUBioToilet Read these instructions before installation If you have any further questions that are not answered in these instructions call 358 40...

Страница 12: ...ion site 2 Ventilation The ventilation pipe D110 is led out The end of the pipe must be 60 cm above the ceiling The delivery includes coupling part D75 mm 110 mm and 110 pipe cap Other necessities are...

Страница 13: ...e is treated in EV 200 KU the strictest sewer cleaning requirements are easily met 2 EV 200 KU S MAINTENANCE Start EV 200 KU correctly during commissioning after emptying Add Drymix to EV 200 KU regul...

Страница 14: ...care and capacity may vary from normal Measures before starting to use even after emptying Place 1 2 cm of Drymix on the bottom of the composting chamber ECO ECO SEP 1 Fill in the biofilter compartme...

Страница 15: ...he humidity and the ventilation pipe add compost litter to cover the waste Flies in the compost Reason No ventilation hat insufficient mixture not enough litter in the compost Remedy Install a ventila...

Отзывы: