www.raisecom.com
User Manual
14
7.2 Installation procedures
7.2.1 Device installation
Please fix the chassis on to the rack and insert the device into the slot of the chassis. Please fasten all
screws.
If network management will not be used, please make sure that the DIP switches on the module have
been set according to need before being fixed into the chassis.
7.2.2 Cable connection
Please make sure that the E1 interfaces and the optical interface are well connected.
7.2.3 Device electrifying
Please fix the module properly in the chassis before turning ON the power supply.
After electrifying, the power supply status indicator PWR on the front panel of the device will turn
ON to show that the power supply is working normally.
Содержание RC832-30
Страница 1: ...www raisecom com RC832 30 BL User Manual ...
Страница 5: ......
Страница 6: ...Release Notes Date of Release Manual Version Revisions 20071122 200706 REV A ...