Raisecom
ISCOM6820-GP (A) Installation Guide
6 Checking hardware installation
Raisecom Proprietary and Confidential
Copyright © Raisecom Technology Co., Ltd.
33
6
Checking hardware installation
This chapter introduces the check items after installation.
Checking equipment room and the surrounding environment
6.1 Checking equipment room and the surrounding
environment
Check the equipment room and surrounding environment after installation according to Table
6-1.
Table 6-1
Checklist of the equipment room and surrounding environment
Item
Requirement
Cable
Strap or splice the excessive cables to fix them to the reserved place
inside the cabinet for future expansion and maintenance and to avoid
loss.
Plug
Protect the unused plugs and cover them with protection caps.
Equipment
room
environment
Keep the equipment room clean and tidy. Clear the obsolete packing
boxes and other sundries. Stack the remaining spares neatly and
reasonably. The grounding resistance should be less than 1Ω, and at the
same time refer to the relevant national or local standards.
6.2 Checking cabinet or workbench
Check the cabinet or workbench after installation according to Table 6-2.