background image

 

3. General information 

 

 
All of our fireplace inserts and stoves are tested and comply with the latest 

 

European norms and safety regulations. Because safety regulations for installation and 
operation of fireplaces vary from one country to another, the owner/operator of this product is 
responsible for compliance with the standards in your region and correct installation. The 
installation and operating instructions must be adhered to. RAIS/Attika cannot be held liable 
for incorrect installation or irresponsible operation. 

 

Please observe all regional and local regulations regarding e.g.:  

 

• Fire protection  
• Safety distances  
• Insulating materials  
• Construction law  
• Size of spark protection plates / floor plates  
• Flue-pipe and chimney connections  
• etc.  

 

If you have any questions please contact your chimney sweep or the 

 

relevant government authorities.  

 

Connection to the chimney 

 

We recommend loose fitting of the elements without use of adhesive, so that you can adjust 
the height of the product before connection to the chimney. Use a spirit level to ensure that 
the elements are mounted horizontally.  

 

The insert will expand when heated. Do not allow the elements to rest on the insert. 

Always allow a space of at least 5 mm above the fireplace insert installation frame. No space 
is required on the side, but the distance between the bottom edge of the frame and the 
element must be minimum 2 mm.  

 

Floor plates / front plates 

 

A fireproof floor plate must be laid in front of and to the side of VISIO 2 Elements if the floor 
consists of combustible material. Please adhere to national, regional and local regulations.

 

 

Acrylic adhesive 

 

The acrylic adhesive supplied is used to glue the elements together, and for gluing 

the 

elements

 to the wall and grouting. Make sure the adhesive surfaces and the surface are free 

of dust.  
After assembling the elements, use the rest of the acrylic adhesive to fill the joints, or for  
grouting. Filling of the joints or grouting is an important part of the installation, and 
significantly contributes to the stability of the stove system.  

 

Hairline cracks 

Small cracks can appear between the elements and the point where the house wall meets 
the insert. This is perfectly normal and does not give cause for concern. Small cracks can be 
removed by grouting with 

acrylic adhesive

. Scrape out grouting with a grouting scraper and 

use a vacuum cleaner to remove debris. Inject 

acrylic adhesive

 and spread using a soapy 

fingertip. The grout can be painted over after 24 hours.
 

Minor damage

Can be repaired with the 

acrylic adhesive

 supplied. In the event of more extensive damage, 

we recommend filling twice to avoid large settling cracks. Small, fine cracks and other 
unevenness should be filled using a small trowel or paint brush. Smooth the surface with a 
damp sponge or sandpaper.
 

Содержание attika Visio 2

Страница 1: ......

Страница 2: ...the manufacturer s specified dimensions and minimum requirements for openings and cladding must be observed When installing the product all local rules and regulations including those that refer to n...

Страница 3: ...but the distance between the bottom edge of the frame and the element must be minimum 2 mm Floor plates front plates A fireproof floor plate must be laid in front of and to the side of VISIO 2 Elemen...

Страница 4: ...before installation and first time use Please comply with the setup and installation instructions for your own safety All safety distances are minimum distances When installing a fireplace always com...

Страница 5: ...split logs on the bottom of the combustion chamber Lay approximately 1 2 kg dry split wood on top for kindling along with 2 or 3 firelighters or similar Never use alcohol gasoline or other flammable...

Страница 6: ...e producing appliance Extractor hoods that have been installed together with fire producing appliances in the same room or connected rooms may adversely affect the function of the stove possibly invol...

Страница 7: ...s and or reduces later cracks in the surface of the plastered chimney Wipe the surface of the chimney cladding with a damp cloth Prewetting of the substrate is not necessary Keep processing temperatur...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Отзывы: