![RAIS/attika NEXO Series Скачать руководство пользователя страница 29](http://html2.mh-extra.com/html/rais-attika/nexo-series/nexo-series_manual_3479638029.webp)
29
Location of chimney terminals
Dimension Terminal Position
Distance (mm)
A*
Directly under an opening, an open window or ventilation duct
600
B
Above an opening, an open window or ventilation duct
300
C
Alongside an opening, opening window etc.
400
D
Under gutter, earth pipes or drainpipes
300
E
Under eaves
300
F
Under balconies or carport roof
600
G
From a vertical drainpipe or earth pipe
300
H
From an internal or external corner
600
I
Overground roof or balcony level
300
J
From a surface facing the terminal
600
K
From a terminal facing the terminal
600
L
From an opening in carport (e.g., door, window into the dwelling)
1200
M
Vertical from a terminal on same wall
1500
N
Vertical from a terminal on same wall
300
P
From a vertical construction on the roof
600
Q
Above the intersection with roof
300
* In addition, the terminal must not be closer than 300 mm to an
opening in the building, such as a window or a door.
UK
Содержание NEXO Series
Страница 1: ...1 POSITIV N E X O G A S GB UK...
Страница 34: ...34 ceramic Logs Log 1 Log 2 Log 3 Log 4 Log 6 Log A Log B UK Log 5...
Страница 36: ...36 4 3 5 Log 3 Log 4 Log 5 UK...
Страница 37: ...37 6 A B Log 6 Log A Log B UK...
Страница 50: ...50 UK...
Страница 51: ...51 UK...
Страница 56: ...56 UK...
Страница 72: ...72 Vertical Roof Terminal with Back outlet for more information see paragraph Location of chimney terminals UK...
Страница 73: ...73 Horizontal wall Terminal for more information see paragraph Location of chimney terminals UK...
Страница 85: ...1 2 3 4 5 NEXO Gas 100 120 140 160 185...
Страница 86: ...86 1 2 3 4 5 8 6 9 8 7 10 NEXO G Gas 100 120 140 160 185...
Страница 87: ...87...