Rainforest Automation EMU-2 Скачать руководство пользователя страница 14

 
 
 

EMU-2

™ 

User Manual 

 

 
 

14 

 
Current Usage 

 
The 

Current  Usage

  screen  shows  the  rate 

of  energy  consumption  and  the  estimated 
cost  per  hour  in  dollars  (or  cents,  if  it  is 
less than one dollar). The estimated cost is 
calculated  from  the  current  price  per  unit 
multiplied  by  the  current  rate  of  energy 
consumption.    The  data  is  updated  from 
the  meter  every  8  seconds  while  this 
screen is shown.   

This  is  like  the  speedometer  in  your  car;  it  shows  you  how  fast  you  are  consuming 
energy.  
 
 

Daily Totals 

 
The 

Daily  Totals

  screen  shows  your 

accumulated  totals  in  graphical  and 
numerical  format  for  energy  consumption 
and estimated cost for the current day and 
the  previous  day.    The  current  day 
(“Today”)  shows  a  running  total  from  the 
start  of  the  day  (midnight)  up  to  the 
present.  At midnight, today’s totals will be 
transferred  to  “Yesterday”,  and  a  new 
running total is started. 

The  graphs  show  hourly  data,  with  a  bar  for  each  hour.    The  height  of  the  bars  is 
proportional  to  the  number  of  kWh  consumed  for  each  hour.    The  graphs  are  auto-
scaling,  and  meant  to  show  relative,  rather  than  absolute  values.    The  small  number 
near  the  top  of  the  center  line  indicates  the  value  (in  kWh)  of  the  highest  bar  in  the 
graphs. 

When  you  first  start  up  your 

EMU-2

™,  there  will  be  no  Yesterday  data,  so  you  will 

dashes in the place of numbers until the end of the first day. 
 
 

 

Current Usage 

$1.28

/hr

10.123 kW

Yesterday          Today

70.4kWh              47.1kWh

$6.34           $3.34

6

Содержание EMU-2

Страница 1: ...EMU 2 Energy Monitoring Unit User Manual Version 1 04 Dec 2012...

Страница 2: ...ld given or loaned to another person Under the law copying includes translating into another language or format Rainforest Automation may have patents patent applications trademarks copyrights or othe...

Страница 3: ...10 Screen Navigation Flowchart 12 EMU 2 Display Screens 13 Startup 13 Current Time 13 Meter Reading 13 Current Usage 14 Daily Totals 14 Total to Date 15 Previous Totals 15 Current Price 16 Message 16...

Страница 4: ...cy energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a p...

Страница 5: ...or your utility to enable the smart meter to connect with your device You must wait until this process is complete before proceeding your EMU 2 will not function correctly until the smart meter is ena...

Страница 6: ...ee these two screens a few times This could take 1 2 minutes When your EMU 2 finds the smart meter and successfully communicates with it you will see this screen A short time later the Current Time sc...

Страница 7: ...2 simultaneously and release b Press the Bottom Button c Select the language you would like your EMU 2 to use 3 25 pm Jun 3 2011 Restart Restart Skip Top Button scrolls through language choices Bottom...

Страница 8: ...t After you have entered all 5 digits of the energy price you will see this screen e Press the Bottom Button and you will see the battery screen f Press any button to return to regular monitor mode Yo...

Страница 9: ...EMU 2 User Manual 9 Features of Your EMU 2 Red Yellow Green Top Button Bottom Button Display Battery Cover Information Label Indicator LED Lights Magnetic Feet Keyhole Slot Power Plug Mini USB Port...

Страница 10: ...g your EMU 2 so that it is powered only by the backup batteries then the unit will run with the backlight off all the time and will go into Sleep Mode after 2 minutes of inactivity In Sleep Mode the D...

Страница 11: ...he Display that various status conditions Normally the green LED should be on while the EMU 2 is in Active Mode and Rest Mode When there is a new text message waiting to be read the red and yellow LED...

Страница 12: ...ls screen Current Usage screen Total to Date screen Manual Mode Top Button 5 seconds Reset Battery screen Current Time screen Bottom Button Bottom Button 4 minutes inactivity 1 minute inactivity Accum...

Страница 13: ...t meter Your EMU 2 updates this data every 4 minutes while it is in Active Mode If you are generating your own electricity and have a Net Metering agreement with your utility then there may be times w...

Страница 14: ...stimated cost for the current day and the previous day The current day Today shows a running total from the start of the day midnight up to the present At midnight today s totals will be transferred t...

Страница 15: ...meter and costs based on your input these numbers may differ from what is shown on your actual utility bill The current time period is defined in the Billing Dates screen in Configuration Mode At midn...

Страница 16: ...User It is also possible to read the price directly from the smart meter If you manually set the price to zero and the meter supports this feature then the EMU 2 will check the price with the meter e...

Страница 17: ...ent to the Confirm Message screen Viewing the message resets the Indicator LED Lights but the envelope icon will remain on until the message has expired Confirm Message The Confirm Message screen allo...

Страница 18: ...e press and release both buttons simultaneously Then press the Bottom Button to get to the Select Language screen The currently selected language will have an arrow beside it Press the Top Button to c...

Страница 19: ...gh the Restart Select Language and Set Rate screens The default billing period is a simple monthly cycle beginning at 00 00 01 on the first day of the month and ending at midnight on the last day of t...

Страница 20: ...es Four bars indicates the batteries have a good charge Fewer bars indicate the battery charge is reduced The batteries should be replaced if the Battery screen shows only one bar When your EMU 2 is p...

Страница 21: ...ep 1 Restart the EMU 2 If the EMU 2 screen is not displaying anything and it does not respond to button presses then try restarting the unit To restart your EMU 2 a Remove the batteries if installed b...

Страница 22: ...smart meter can be disrupted for a variety of reasons Try the following a Move the EMU 2 to a different location that is closer to the smart meter b Move the EMU 2 away from wireless routers cordless...

Отзывы: