D
N10
H3
H11
H17
H28
H3
H11
H17
H28
H50
H4
H4
H60
H4
H56
N26
N27
81
77
N11
1. Place Swing Beam Plate
(N10)
on top of Top Joist with Swing Holes
(77)
and attach through the two outside
holes using 1/2" Hardware
(H4)
and 3/8" Hardware
(H50) (H3) (H11) (H17)
.
*NOTE: Do not tighten Hardware at this time.
2. Lift the Swing Beam Assembly into position on top of the Swing Beam Plate
(N10)
and attach using 1/2"
Hardware
(H4)
and 3/8" Hardware
(H56) (H60) (H3) (H11) (H17)
.
*NOTE: Check level of Swing Beam at this time. Slight adjustments can be made by adding or
removing soil from under the Swing Beam Support. If Swing Beam cannot be leveled, remove
Hardware in Support Plates (N11) and move to second set of holes on the Swing Beam.
3. Tighten all Swing Beam hardware from Steps 15,16, and 18. Add 3/8" Acorn Nuts
(H28)
to Hardware in Swing
Beam Plate
(N10)
and tighten.
4. Attach Swing Options to Swing Hangers
(N26)
using Spring Clips
(N27)
.
*NOTE: Only three Swing Options can be attached at the same time.
36
Step 18
Swing Beam Assembly