![Rain Bird WS PRO LT Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/rain-bird/ws-pro-lt/ws-pro-lt_installation-manual_782326006.webp)
WS PRO LT weather station
5
Figure 2 Lift Straps
Note: Avoid resting the weather station on the wind speed and wind direction sensors
3.
Connect the serial cable (male connector) to the weather station’s RS-232 port.
Be sure to remove dust
cover from the weather station RS-232 port before connecting the cable.
4.
Connect the serial cable (female connector) to computer serial COM port
5.
Connect power to the weather station (i.e. solar power, user supplied DC power)
6.
Turn the key to the ON position.
Weather Station Configuration
1.
Request
Automatic ET
and
Multiple Weather Stations
module keycodes from Global Service Plan
(GSP) or from your local Rain Bird distributor
2.
Start Rain Bird central control software (i.e. Cirrus, NimbusII or StratusII)
3.
Enter your keycode by clicking on the
Software Modules Options
button and entering the keycode(s)
in the corresponding box (see Figure 3)
Figure 3 Keycode Dialog Box
Содержание WS PRO LT
Страница 1: ...WS PRO LT Weather Station Installation Manual ...
Страница 2: ......
Страница 13: ......
Страница 14: ......