3
RailKing N&W J Steam Engine
Set Up Checklist
• Assemble RealTrax
®
• Connect the transformer
• Lubricate the train
• Place the engine and cars on the track and couple them together
• Apply power to run as described in the Basic Operation section of
these instructions.
Assembling RealTrax
®
Unlike other O Gauge track systems, each RealTrax section features a realistic
built-in roadbed base, solid nickel-silver track rails, and realistic railroad ties,
all designed to give you an authentic looking track system. The quick
connectors and built-in roadbed allow you to set up RealTrax anywhere,
including most carpeted surfaces, without the need for track nails or the worry
of carpet stains.
Each RealTrax segment has at least one knock-out tab in the roadbed (on either
end of the segment) that can be removed with a pair of pliers to reveal an
opening for the lock-on that is used to connect the transformer to the track. To
assemble RealTrax, follow the instructions below.
Knock Out must be
removed before
Remote Lock On can
be installed
Remove Knock Out
by Holding and Twisting Up
with a pair of pliers
1a
1c
1b
1d
Make sure the
metal contacts
line up.
Fig. 1a-1d: Installation of Remote Lock On