background image

 

 

Operator’s Manual 

 

 

© Copyright 2018 - Rail-Ability Limited 

Page 

8

 of 

71

 

Conversion 

5  Decal Legend 

 
The decals on this machine use symbols, colour coding and signal words to identify the following: 
 

 

Red with safety alert symbol 

– used to indicate the presence of an 

imminently hazardous situation which, if not avoided, will result in death or 
serious injury. 

 

Safety alert symbol 

– used to alert personnel to potential personal injury 

hazards. Obey all safety messages that follow this symbol to avoid possible 
injury or death. 

 

Orange with safety alert symbol 

– used to indicate the presence of a 

potentially hazardous situation which, if not avoided, could result in death or 
serious injury. 

 

Yellow with safety alert symbol 

– used to indicate the presence of a 

potentially hazardous situation which, if not avoided, may cause minor or 
moderate injury. 

 

Yellow without safety alert symbol 

– used to indicate the presence of a 

potentially hazardous situation which, if not avoided, may result in property 
damage. 

 

Green 

– used to indicate operation or maintenance information. 

 
These symbols are also used in this manual as an appropriate visual indication and their meaning is 
as detailed above.  
 

Be sure all decals, including those shown in the Decals Section of this manual, are in place and legible. 

 

Содержание Atlas RA350LCSR

Страница 1: ...perator s Manual Copyright 2018 Rail Ability Limited Page 1 of 71 Conversion Part no RAA350COPS 001 Issue 1 April 2018 Original Instructions English RA350LCSR Atlas Tracked Excavator Operator s Manual...

Страница 2: ...the Rail 15 8 Boom Safety 17 8 1 Requirements 17 8 2 General 17 8 3 Residual Risks 18 8 4 Before Operating 19 8 5 During Operation 19 8 5 1 Safe Working Distances 19 8 5 2 Load Handling 20 9 On Off Tr...

Страница 3: ...40 15 3 Uncoupling and Off Tracking 41 16 Emergency Recovery 42 17 Pre Operation Actions 43 17 1 Requirements 43 17 2 General 43 17 3 Inspection 43 17 4 Completion 44 18 Routine Maintenance 45 18 1 Re...

Страница 4: ...e Drawings Principle Dimensions 66 27 2 Principle Dimensions 68 27 3 OTP and W6A Gauge Points 70 FIGURES Page Figure 1 Safe Distance metres from Power Lines in excess of 33kV on Steel Towers 10 Figure...

Страница 5: ...AUTHORISED PERSONNEL SHALL BE PERMITTED TO OPERATE THIS MACHINE THIS MACHINE IS VERY COMPLEX AND POTENTIALLY DANGEROUS IT IS IMPORTANT THAT BEFORE ANY USE OF THE MACHINE OCCURS EXCEPT TRANSPORTATION...

Страница 6: ...or rail wheels to enable operators and personnel to undertake maintenance work underneath overhead lines and structures forming part of the rail infrastructure The RA350 complies with the provisions...

Страница 7: ...ated April 2018 S60 Quick Hitch User Manual Steel Wrist User and Installation Manual Symmetrical Quick Couplers with Front pin lock S40 S70 Doc No 700277ENA The Test instructions of the BMAIR Cab Filt...

Страница 8: ...lert symbol used to indicate the presence of a potentially hazardous situation which if not avoided could result in death or serious injury Yellow with safety alert symbol used to indicate the presenc...

Страница 9: ...traffic regulations while driving the machine on roads Be aware of the machine s overall length width and height Avoid hazardous situations The lack of maintenance may cause damage or hurt people Know...

Страница 10: ...the danger of electrocution before moving If closer than 10 metres from the boom the machine the load or the electric line move at least 10 metres away by shuffling away with small steps in order to...

Страница 11: ...erminals Remove all rings watches and other jewellery Ensure a C Form has been obtained before on tracking the machine in OLE areas 6 4 Travel Hazards Observe and use colour coded direction arrows on...

Страница 12: ...the cab onto the ground Machine deck Take care when on the deck when performing inspection or maintenance particularly in wet or icy conditions Remove or secure any loose equipment or tools that could...

Страница 13: ...re of Crushing Hazards when grasping any part of the boom or chassis frame Personnel are not permitted between moving machines Maintain safe distances between ground personnel and the machine Do not o...

Страница 14: ...er 6 12Lifting Hazard Use the appropriate number of people and proper lifting techniques when lifting batteries drawbars tools other removable items 6 13Damaged or Malfunctioning Machine Hazards Do no...

Страница 15: ...observe minimum clearance from overhead wires Ensure a relevant C Form is obtained Never use in 3rd and 4th rail areas Never use on track without a possession Never use on track under live OLE Never...

Страница 16: ...SO THAT THE UPPER STRUCTURE IS PARALLEL TO THE LOWER STRUCTURE AND THAT THE CAB DOOR IS SHUT TO ENSURE THIS IS MAINTAINED IT IS ALSO ESSENTIAL THAT THE ARM IS POSITIONED LOWER OR EQUAL TO THE HEIGHT...

Страница 17: ...ned on the track Use the boom in accordance with the use and maintenance manual making sure that the load and radius are within the maximum limits shown on the load chart the boom is used progressivel...

Страница 18: ...s if it is used for improper tasks side oblique or reversal pull if it is used in poor sites corrosive environment too high or too low temperature foundry see Workplace Assessment if the load exceeds...

Страница 19: ...that safety and protection devices shown above and detailed below are fitted and active Check valve for boom rams Check valve for dipper ram Check valve for cab ram Rotation limiting device Check valv...

Страница 20: ...the minimum safe distances Part of body Minimum safe working distance mm Figure Part of body Minimum safe working distance mm Figure Whole body 500 Foot 120 Head 300 Hand wrist fist 100 Leg 180 Toe 50...

Страница 21: ...Do not operate with sudden movements Activate the controls with slow and progressive movements and rotate slowly and with care paying attention to the stability of the machine With vertical lift rota...

Страница 22: ...ut in accordance with railway regulations Work must be carried out in accordance to rulebook GE RT 8000 and all safety precautions must be followed at all times When working on electrically operated r...

Страница 23: ...urned to its stowed position using the Battery Driven Pump There are 2 methods of emergency recovery of the machine both of which use the cab controls In order of preference these are Machine Engine B...

Страница 24: ...ed Once the over ride system is activated the data logger will monitor the system Note that it is possible to overstress and overturn the machine while the safety systems are overridden The operator s...

Страница 25: ...Off Tracking area must be inspected for its suitability as normal An area where there are no obstructions should be selected For example there should be no conductor rail present no high ballast shou...

Страница 26: ...ad Make certain that the rail bogies are raised up to the maximum height for travel If the machine tips or tilts forward severely onto the track while climbing off the rail head and the weight of the...

Страница 27: ...ils 3 Top Deck Access Steps 4 Counterweight 5 Auxiliary Counterweight 6 Fuel Filler 7 Hydraulic Oil Filler 8 Rear Tow Coupling 9 Rear Draw Bar 10 Rear Rail Gear 11 Engine 12 Batteries 13 Cab 14 Cab Ac...

Страница 28: ...the RCI rail axle selector screen NOTE The Machine must be slewed over one chassis end or the other to deploy retract the rail axles Please refer to the RCI Operators Manual for further information St...

Страница 29: ...IONS WITH THE RCI OVERRIDDEN OR IN DIG MODE AND OPERATORS CAN BE PROSECUTED IN THE EVENT OF AN ACCIDENT Dig mode must only be used for digging When on rail the force that can be exerted by the machine...

Страница 30: ...machine will stop very abruptly which is uncomfortable for the operator and may cause a free hanging load on hook or attachment to swing The functions inhibited by operation of the emergency stopping...

Страница 31: ...iary Controls The extra tilt rotator extend functions are operated using optional levers with 4 auxiliary rollers on top of the left and right hand levers see Figures 8 and 9 For other auxiliary funct...

Страница 32: ...e 5 Tilt Roller TILT ROTATOR 6 Axle Lock Toggle Front Green Button 7 AUX 1 TILT ROTATOR Front Roller 8 Rail Axle Lock Toggle 9 Bucket Grab Diverter Toggle Figure 8 Left hand lever 1 Rotate Roller TILT...

Страница 33: ...the access to Axles for rail axle control functions and Menu can only be obtained when this page is displayed using the RCI Screen It is only on this page that it is possible to control the Axle lock...

Страница 34: ...1900Nm 12 6 5 Service Brake The latching foot brake provides a dig brake in rail mode The rail service brakes should be tested on a regular basis in accordance with the vehicle maintenance instruction...

Страница 35: ...e not fully deployed confirmed green The machine is still operated by forward reverse lever as on a construction site However when travelling on rail only the right hand drive lever pedal is required...

Страница 36: ...details Where a data logging system is found not to be operational then the machine shall not be used until the machine is repaired and fully confirmed as operational This requirement applies irrespe...

Страница 37: ...Operator s Manual Copyright 2018 Rail Ability Limited Page 37 of 71 Conversion GROUNDING OUT FORCING OR STRIKING THE TRAILER WHILST THE MACHINE IS CARRYING IT OFF RAIL MAY RESULT IN SEVERE DAMAGE...

Страница 38: ...ailer tow bar to the towing machine but not the brake hoses Undertake a pull test and check the trailer the trailer resists the movement Note If the trailer is already on line undertake a pull test an...

Страница 39: ...itted and additional trailers that do have air reservoirs WARNING BRAKE LINES ON TOWING MACHINES WITHOUT AIR RESERVOIRS WILL PHYSICALLY INTERCONNECT TO TRAILERS WITHOUT AIR RESERVOIRS THIS MUST NEVER...

Страница 40: ...WARNING Newer attempt to connect a towing jaw end of a vehicle to another towing jaw end of a vehicle unless following emergency recovery procedures Carry out a test pull The trailer brakes should res...

Страница 41: ...NT MAY RESULT IN DAMAGE TO THE MACHINERY AND OR THE RAIL INFRASTRUCTURE AND MAY RESULT IN SEVERE INJURY OR DEATH TO PERSONNEL 15 3Uncoupling and Off Tracking Bring the towing machine to a stop apply t...

Страница 42: ...ly 2 mph as the recovery vehicle has to brake for both vehicles and at a higher speed braking distance would be greatly increased Switch on machine ignition switch Switch RCI on and place in override...

Страница 43: ...shift The inspection is designed to discover if anything is apparently wrong with a machine before the operator performs the function tests The pre operation inspection also serves to determine if ro...

Страница 44: ...pins and other fasteners Lubrication points Tow bar Fire extinguisher Rail wheel hubs treads flanges and rail sweepers Ladders steps and hand rails Guards and covers Check the entire machine for Crack...

Страница 45: ...engine components Check the oil level with the engine off Refer to the OEM manuals detailed in section 4 18 4Hydraulic Oil Level Maintaining the hydraulic oil at the proper level is essential to mach...

Страница 46: ...condition of rail wheel treads and flanges for pitting scoring bruising flat spots or other damage 3 Check that no cracks flats or scoring are visible Refer to Service Manual listed in section 4 for...

Страница 47: ...again before putting the machine into service If in doubt contact Rail Ability Ltd Refer to the sections below and carry out each of the items in turn 19 3From the Machine Cab 1 Turn the ignition key...

Страница 48: ...the rear axle then operate the dozer up down lever backwards to raise the rail axle o Result The rail gear should not lower 16 Disable lift mode on the RCI 17 Following the instructions in the Rail A...

Страница 49: ...y Limited Page 49 of 71 Conversion THE BRAKES MUST BE ABLE TO HOLD THE MACHINE ON ANY SLOPE IT IS ABLE TO CLIMB 23 Always close the cab door 19 4Completion If the machine is to be used carry out the W...

Страница 50: ...machine to overturn Hazardous locations OHLE power cables Overhead and high voltage conductors Obstructions including Building walls Balconies Eaves Scaffoldings Tree branches Any items that may lift...

Страница 51: ...Operator s Manual Copyright 2018 Rail Ability Limited Page 51 of 71 Conversion 20 4Completion If the machine is to be used carry out the Operating Instructions detailed in this manual...

Страница 52: ...this operator s manual 2 Perform Pre operation Actions 3 Perform Function Tests 4 Carry out a Workplace Assessment These Operating Instructions detail each aspect of machine operation 21 3Emergency St...

Страница 53: ...n using the cab controls Follow the Off Tracking procedure described in this manual and the relevant Rail Ability manual 21 7Work Lights The work lights on the booms can be switched on and off by usin...

Страница 54: ...plate indicate the maximum load that the boom can lift at a certain radius and at a certain height During load handling do not exceed the reach limits given or the load indicated on the above mention...

Страница 55: ...rails 4 Straddle the track and align the rear rail axle with the track 5 Deploy the rear rail axle to only just lift the rear tracks slightly clear of the sleeper ends 6 Manoeuvre the machine to alig...

Страница 56: ...THE FRONT TRACK IDLERS ARE CORRECTLY SET TO GIVE ADEQUATE TRACK GAUGE CLEARANCE 150MM OF CLEARANCE FROM THE UNDERSIDE OF THE TRACK PADS TO THE RAIL HEAD IS REQUIRED TO CLEAR INFRASTRUCTURE DO NOT OVE...

Страница 57: ...not be loaded and a suitable transport machine must be obtained After the machine is loaded 1 Ensure that the rail gear remains raised after loading Only the tracks must be contacting the deck of the...

Страница 58: ...ect the entire machine for loose or unsecured items Use chains of ample load capacity Use a minimum of 2 chains per side Adjust the position to prevent damage to the chains and machine Never chain ove...

Страница 59: ...lowered to ground position Always fully stow the attachment before disengaging the quick hitch Always recheck the quick hitch Always recheck the attachment is fastened securely The RCI should be in L...

Страница 60: ...CSR ISO 06 2012 Transparent instruction sheet in cab 1 28161C Crush Hazard 4 28164 116C Hazardous materials in cab 1 28171 E No smoking in cab 1 4931628 03 2000 Oil volume and pressure in cab 1 52475C...

Страница 61: ...f 71 Conversion Figure 11 Base Machine Front Nearside Isometric View A2896 6114314 28161C 28161C 52475C A3973 52475C A4281 6114315 6155511_en DANGER OVERHEAD LIVE WIRES DANGER OVERHEAD LIVE WIRES DANG...

Страница 62: ...se Machine Rear Offside Isometric View 52475C 6062086 A3973 28161C 6133691 6114315 A2896 52475C 28161C 6037330 A3779 A3778 DANGER OVERHEAD LIVE WIRES DANGER OVERHEAD LIVE WIRES DANGER OVERHEAD LIVE WI...

Страница 63: ...Operator s Manual Copyright 2018 Rail Ability Limited Page 63 of 71 Conversion Figure 13 Base Machine Front View A3778 A2236 A4281 A3379 DANGER OVERHEAD LIVE WIRES...

Страница 64: ...d Maximum hydraulic pressure 400 bar Hydraulic tank litres Fuel tank litres Weights Overall weight 33 000 kg Gross Weight with Aux Counterweight Fitted 37 000 kg Max Rail Wheel loading in working mode...

Страница 65: ...ough Raised Checkrails 5 mph May Be Used On LIVE 3 Or 4 Rail Lines NO Maximum Working Cant N A May Be Used On ISOLATED 3 Or 4 Rail Lines YES Maximum Travelling Cant 200mm May Be Used Adjacent To Runni...

Страница 66: ...ad Mode Position of the centre s of gravity are dependent on load on hook slew position and boom positions so these are omitted for risk of being misleading Both road axles are powered Exhaust Outlet...

Страница 67: ...it points must be visually checked when approaching and passing lineside structures No lateral exceedances are allowed on track curves Both rail axles are powered with an independent hydraulic motor g...

Страница 68: ...Operator s Manual Copyright 2018 Rail Ability Limited Page 68 of 71 Conversion 27 2Principle Dimensions Figure 16 Swing Radius...

Страница 69: ...Operator s Manual Copyright 2018 Rail Ability Limited Page 69 of 71 Conversion Figure 17 Swing Radius with Aux Counterweight...

Страница 70: ...0 of 71 Conversion 27 3OTP and W6A Gauge Points Figure 18 OTP Gauge Critical Gauge Limit Points Slew Left Critical Gauge Limit Points Stub boom lift Critical Gauge Limit Points Superstructure Slew rig...

Страница 71: ...f 71 Conversion Figure 19 W6A Gauge without RRV road crawler allowance Critical Gauge Limit Points Slew Left Critical Gauge Limit Points Stub boom lift Critical Gauge Limit Points Superstructure Slew...

Отзывы: