background image

EDGE POWER STATION 

USER MANUAL

ACC PS2 U2 04

888-987-1011  |  raffel.com  |  customerservice@raffel.com

1. Place mounting bracket on 
    bottom of the power station

2. Attach mounting bracket using     
    the provided screws

UNDER MOUNT ASSEMBLY INSTRUCTIONS

1. Choose a location for the power station near 120V power 
    source. Place the power station onto horizontal surface 
    until bracket is 

flush

3. Plug power station into
    120V power source 

2. Mount the power station to 
the surface using screws 

UNDER MOUNT INSTALLATION INSTRUCTIONS

Отзывы: