INSTALLATION MANUAL
NEO
Страница 1: ...INSTALLATION MANUAL NEO...
Страница 2: ...installation Before you touch the charger for any reason turn off the upstream residual current operated circuit breakers with integral over current protection RCBO Ensure proper installation Only ins...
Страница 3: ...ead to injury Don t submerge the charging connector in water Resist the urge to disassemble repair or modify the product yourself Avoid dropping squeezing or piercing the product Don t fold crush or d...
Страница 4: ...1 Product overview 2 Accessories 3 Specification...
Страница 5: ...nd Charge Backend protocol OCPP 1 6 JSON Software upgrade OTA via APP OCPP Electrical Design Power supply Single phase 230VAC 20 50 60Hz Three phase 230 400VAC 20 50 60Hz Earthing System TN TT IT Prot...
Страница 6: ...nitor device is integrated inside the charger the charger will stop charging in case residual current exceeding 6mA DC is detected according to IEC 62955 The RCD is automatically tested between each c...
Страница 7: ...5 Installation instructions 5 1 Positioning Ensure that the installation surface is solid enough to hold the charger It is recommended that the wall have a bearing capacity of at least 100 kg Place t...
Страница 8: ...sert four plastic anchors into four openness Mount the backplate and fit the four openness Use four wall mounting screws to fasten the backplate 5 3 Wiring Notice Switch off the upstream RCBO Safety f...
Страница 9: ...ng Three phase wiring 5 4 Push in and fasten Push the device in and you will hear a sound of clip Use two security screws to tighten the device Use two security labels to stick on the two screws at th...
Страница 10: ...5 1 Single phase with 1 CT wiring for Home Balance To use home balance function the charger should connect to your mobile phone and set Home Balance via RAEDIAN APP 5 5 2 Three phase with 3 CTs wiring...
Страница 11: ...5 5 3 Single phase with 2 CTs wiring for Home Balance and Solar Only 5 5 4 Three phase with 3 CTs wiring for Home Balance and Solar Only single phase...
Страница 12: ...5 5 5 Three phase with 3 CTs wiring for Home Balance and Solar Only three phase...
Страница 13: ...6 Installation Acceptance Inspection 6 1 OLED Display Power on the charger OLED Display and LED light stripes will be automatically on After the booting the OLED Display will show READY Booting...
Страница 14: ...in Pending for authorization or waiting for EV Cyan Charging in progress Red Fault state 6 3 EV Charging test Plug in the cable into EV socket inlet or EV simulator charging will start immediately RAE...