FinM
Deployment
Guide
Release
4.5.10
4
‐
6
Project
Tab
Configuring
the
Radio
Network
Figure
4
‐
3:
Configurator
‐
Project
tab,
upper
table
Band:
Click
this
pull
‐
down
menu
to
choose
the
frequency
band
to
be
used
for
the
project.
Only
those
bands
that
are
in
accordance
with
your
regulatory
environment
will
appear.
Channel
Bandwidth:
Click
this
pull
‐
down
menu
to
choose
the
bandwidth
to
be
used
for
this
project.
The
frequencies
used
in
the
Tower
tab
(F1,
F2,
F3,
etc)
will
be
the
base
frequency
chosen
in
Band,
with
the
bandwidth
added.
Note
that
not
all
frequency
bands
allow
all
bandwidths
to
be
used.
Synchronization:
Click
this
pull
‐
down
menu
to
choose
the
type
of
synchronization
used
in
this
project:
Integrated
GPS:
Use
a
GPS
unit
integrated
in
the
TBS.
Used
in
above
ground
scenarios.
GSU:
Use
an
external
GPS
unit.
Used
in
above
ground
scenarios.
Note
that
this
requires
extra
installation
and
configuration
for
the
GSU.
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...