FinM
Deployment
Guide
Release
4.5.10
2
‐
13
TBS
Mounting
Site
Installation
2. Place
this
assembly
on
the
pole
where
you
want
to
mount
the
TBS.
Once
it
is
in
place,
rotate
the
pole
clamp
as
shown,
then
tighten
both
bolts.
Horiztonal
Pole
‐
thick
1. Diameter
larger
than
3:
Use
metal
bands
(not
supplied),
threaded
through
the
holes
as
shown
in
,
or
U
‐
bolts
(not
supplied),
fastened
using
the
holes
as
shown
in
:
TBS
mounting
on
a
wall
1. Fasten
the
standoffs
to
the
base
plate
in
the
holes
labeled
“V”
or
“H”,
whichever
is
more
convenient,
as
shown:
Figure
2
‐
24:
Medium
pole:
Rotate
clamp
Figure
2
‐
25:
Medium
pole:
tighten
bolts
Figure
2
‐
26:
Using
metal
bands
for
a
large
poleFigure
2
‐
27:
Using
U
‐
bolts
for
a
large
pole
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...