FinM
Deployment
Guide
Release
4.5.10
4
‐
31
Configurator
Messages
Configuring
the
Radio
Network
Figure
4
‐
20:
ISU
‐
Re
‐
configuration
3. Click
OK
to
complete
the
configuration.
It
may
take
about
a
minute
to
complete.
You
will
receive
one
of
the
completion
messages
described
in
below.
4.7
Configurator
Messages
Table
4
‐
5:
Configurator
Message
Color
Codes
Color
Code
Meaning
Action
Required
Red
Operation
failed
Varies
with
message
Yellow
OK
Repeat
the
operation
Green
OK
Operation
successful
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...