13
Place the scale on an even surface, install ramps onto the steel brackets.
Remove ramps, looking through bracket holes mark spots where openings
for anchor bolts are to be made.
Drill openings, mount steel brackets to the ground.
7.2. Levelling: 1-Load-Cell Platform Scales
It is necessary to level the scale, do it by turning its feet. Keep turning the feet
until the air bubble takes central position.
5 - nut
6 - washer
7 - centring cone
8 - anchor bolt
Содержание TWM4
Страница 1: ......
Страница 2: ...2 MARCH 2021...
Страница 10: ...10 Mass converter RS485 cable PT0012 Mass converter Ethernet cable PT0224 Mass converter 4IN 4OUT cable PT0209...
Страница 21: ...21...