
67
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
Picture 22. The representation of the display upon choosing option Daily
Picture 23. The representation of the display upon choosing the option Weekly
Picture 24. The representation of the display upon choosing option Weekend
8.3. Starting the CUBA
pellet stove
STEP 1:
The stove is connected to the hydraulic system.
STEP 2:
Insert pellets into the silo.
STEP 3:
Inspect if all lids are tightly closed and if the stove door is properly closed.
STEP 4:
Start the stove, the switch is located at the back of the stove.
Picture 25. The representation of the pellets insertion opening