Installation Manual  

Wall hung storage boiler Low NOx   – Cod. 99960NA – November  2002

 

 

 

 

10 

• 

check there are no obstructions in the exhaust duct; 

 

• 

check the pressure in the system: if this has gone down and LED 13 (see fig. 2 pag. 9) comes on restore pressure

;

 

• 

close the tap on the filling loop once this operation is completed; 

 

Starting up the boiler 

• 

open the gas cock; 

• 

turn on the boiler;

 

• 

set selector switch 1 to either the   summer or   winter symbols (see fig.1 pag. 9); make sure that no. 6 light is ON (see 
fig. 2 pag. 9). The automatic ignition system will turn the burner on. It may be necessary to repeat the procedure a few times 

to purge air from the pipes. To repeat the ignition procedure press release button 2 (see fig.1 pag. 9) and then try the ignition 

procedure once again. If the boiler does not start, press the reset button 2 (see fig. 1 pag. 9). IMPORTANT should the boiler 

fail to ignite wait 3 minutes before pressing button again.  

• 

turn selector switch 1 to the «off» position (see fig. 1 pag. 9), insert a gauge into the pressure point (see fig. 4 pag. 12; pos. 
no. 4), turn on the boiler and check the minimum and maximum calibration pressures of the modulator in accordance with 

those stated on the  gas plate; (to check the maximum modulation pressure of the modulator, turn on a hot water tap and 

check that the maximum pressure is equal to that stated on the plate; to check the minimum, undo one wire from the 

modulator coil and check on the gauge that the minimum pressure is equal to that stated on the plate; if the maximum 

pressure is not the same as stated on the plate, calibrate the modulator again; 

• 

once the calibration procedure has been completed, unplug the mains lead or turn off the mains switch, close the gas cock 

and remove the gauge from the pressure point; tighten the screw making sure there are no gas leaks; 

• 

after carrying out this operation, return the panel to its correct position and put the front casing back. 

 

CHECK

 the maximum heating power. 

For procedure regarding regulation of the heating system thermal capacity 

see «BOILER ADJUSTMENTS». 

 

EMPTYING THE CENTRAL HEATING SYSTEM 

Whenever it is necessary to empty the system, proceed as follows: 

• 

turn off the main power supply switch; 

• 

wait for the boiler to cool down; 

• 

turn the system drain tap RS (see fig. 4 pag. 9) and use a container to collect the water that runs out; 

 

 

EMPTYING THE DOMESTIC HOT WATER SYSTEM 

Whenever there is danger of freezing, the hot water system should be emptied in the following way: 

• 

shut off the water at the mains; 

• 

open all hot and cold water taps; 

• 

empty from the lowest point (where possible). 

 

WARNING 

Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to do this 

may in validate the guarentee.

Содержание RMAS 21 E

Страница 1: ...fication RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS WITH DOMESTIC HOT WATER STORAGE CYLINDER Low NOx Mod...

Страница 2: ......

Страница 3: ...S page 4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 16 17 BOILER CONTROL PANEL page 9 STARTING UP THE BOILER FOR THE FIRST TIME page 9 BOILER ADJUSTMENTS page 11 MULTIGAS OPERATION page...

Страница 4: ...pped with an expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up m...

Страница 5: ...ating bar 3 Min working pressure heating bar 0 3 Expansion vessel capacity initial pressure 1 bar Litres 8 Hot stored water max temperature C 60 Continuous hot water drawing with t 30 Litres h 720 Max...

Страница 6: ...aust into a flue duct and the air intake directly from an external wall To insert a bend reduce total flue length by 1 5 m R RETURN G GAS C HOT WATER OUTLET F COLD WATER INLET A HEATING FLOW NOTE USE...

Страница 7: ...ith BS6891 1988 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as describe...

Страница 8: ...egion consulted Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a pur...

Страница 9: ...bracket and the JIG 4 Make connections to the hot and cold water supply to the gas pipe and to the heating system with the fittings supplied with the boiler JIG Connect pipes and valves as shown in th...

Страница 10: ...or and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost system will onl...

Страница 11: ...th the earth symbol see fig 3 connect the blue wire to the terminal marked with the letter N connect the brown wire to the terminal marked with the letter L CONNECTION OF ROOM THERMOSTAT NOTE use low...

Страница 12: ...en the gas cock and check the gas seals making sure the counter shows no sign of leaks in any case double check by using a soapy solution and eliminate all eventual leaks The checking procedure for th...

Страница 13: ...ot water tap and check that the maximum pressure is equal to that stated on the plate to check the minimum undo one wire from the modulator coil and check on the gauge that the minimum pressure is equ...

Страница 14: ...er for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockwise to decre...

Страница 15: ...the spring once this has been done reassemble everything e move the jumper on the circuit board to suit the type of gas fig 4 f on boilers with pilot flame ignition the pilot flame jet 6 fig 3 must be...

Страница 16: ...clips 2 Fig C Slide out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which...

Страница 17: ...nk One advantage of this system is the amount of water immediately available thanks to the large exchanger surface of the coil inside the boiler which allows different services to be used simultaneous...

Страница 18: ...l in the following cases if a two way zone valve is installed if thermostat valves are installed in the radiators To adjust the by pass proceed as follows see fig 2 pos A fit the screwdriver to the pl...

Страница 19: ...LED5 C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC...

Страница 20: ...SAN RLA T RIS 50 49 51 MAX RIS 60 53 55 54 RVB 40 30 57 56 50 58 RV 80 70 17 23 19 24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRE...

Страница 21: ...rate and temperature When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing...

Страница 22: ...q replace it r change over polarity s make earth connection t fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on u circulation pump burned out or blocked...

Страница 23: ...SSURE SWITCH 1 8 15 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 16 96026LA D H W CYLINDER TEMPERATURE 90 PRESSURE 7BAR SAFETY VALVE 17 20030LA INSULATED 25 LT STORAGE CYLINDER 18 95006LA 10 LT EXPANSION T...

Страница 24: ...1329 828555 All descriptions and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the ac...

Отзывы: