Radar Systems Zond Aero 500 Скачать руководство пользователя страница 6

 

 

 

 

 

Fig. 6. Data acquisition mode. 

 

5. Enter 

Setup

 menu. Once 

Setup

 is activated, the screen shows 

ZOND SYSTEM 12e SETUP

   

dialog  box  as  on  the  picture  below.  Menu  options  are  selected  using  cursor  keys  and  Enter  or 
Space. A signal may not be seen in the proper position as on the picture at the first run. To set 
correct  position  of  the  signal  choose  the 

Pulse  delay

  menu  and  press  “

A

” key on keyboard to 

start  automatic  adjustment.  Press  the  Enter  and  then 

Close 

setup  menu  after  pulse  delay 

adjustment is finished. 
 

 

Fig. 7. Setup menu. 

 
Note: Zond Aero 500 GPR has built-in deactivating mechanism, i.e. transmitter is switched 
ON  only  when  operator  enters  the  SETUP  dialog  box  or  STARTs  a  data  acquisition. 
Transmitter switches OFF immediately after operator STOPs the data acquisition or leaves 
the SETUP dialog box. 
 
 

2.3. Data acquisition.  

 

Содержание Zond Aero 500

Страница 1: ...Zond Aero 500 Ground Penetrating Radar USER S MANUAL Riga 2021 Darzauglu Str 1 105 Riga LV 1012 Latvia Phone Fax 371 67141041 E mail radsys radsys lv Web www radsys lv...

Страница 2: ...8 7 A h which is built in to the shockproof case The status of the battery voltage and percentage of the battery level is transmitted via TCP IP protocol during data acquisition and is displaying by...

Страница 3: ...3 Connect the survey wheel cable coming out from the shockproof case control panel to the control unit Fig 1 Zond Aero 500 GPR Fig 2 Zond Aero 500 GPR in the shockproof case...

Страница 4: ...l panel with mounted Zond Aero 500 GPR Fig 4 Survey wheel mounted on the shock proof case 2 2 First run of the Zond Aero 500 GPR 1 Place the Zond Aero 500 GPR in a working position as it shown on Fig...

Страница 5: ...onfiguring the computer to connect with Zond 12e GPR Control Unit and paragraph 6 What to Do Immediately After Installation 3 Run Prism2 software its main menu is shown on Fig 5 Fig 5 Main menu of Pri...

Страница 6: ...position of the signal choose the Pulse delay menu and press A key on keyboard to start automatic adjustment Press the Enter and then Close setup menu after pulse delay adjustment is finished Fig 7 S...

Страница 7: ...too short it is possible to add one more cable using the coupler included in accessories kit Fig 8 Zond Aero 500 GPR data acquisition Right after SETUP dialog box is closed button START activates Pres...

Страница 8: ...than 35 C it is not recommended to leave the instrument in place where it can be affected by the direct sun light 4 TRANSPORTATION RULES 4 1 In case of observing of rules of packaging of the instrumen...

Страница 9: ...ting to Electromagnetic Compatibility and Radio Spectrum Matters 99 5 EC Short range devices Ground and Wall Probing Radars applications Low voltage Directive 73 23 EEC and the Amendment Directive 93...

Страница 10: ...user s authority to operate the equipment Operation of this device is restricted to law enforcement fire and rescue officials scientific research institutes commercial mining companies construction c...

Страница 11: ...only for Domestic United States users The Federal Communications Commission FCC requires that all users of GPR who purchased antennas after July 15th 2002 register their equipment and areas of operati...

Страница 12: ...nt d Industrie Canada Fran ais Ce dispositif est conforme la norme CNR 220 d Industrie Canada applicable aux appareils radio exempts de licence Son fonctionnement est sujet aux deux conditions suivant...

Страница 13: ...13 9 OUR ADDRESS Radar Systems Inc Darzauglu Street 1 105 Riga LV 1012 LATVIA Phone 371 67141041 E mail radsys radsys lv...

Отзывы: