1260-X121 User Manual
Racal Instruments
©
2005
Installation Instructions 2-1
Chapter 2
INSTALLATION INSTRUCTIONS
Unpacking and
Inspection
1. Before unpacking the switching module, check the exterior of
the shipping carton for any signs of damage. All irregularities
should be noted on the shipping bill and reported.
2. Remove the instrument from its carton, preserving the factory
packaging as much as possible.
3. Inspect the switching module for any defects or damage.
Immediately notify the carrier if any damage is apparent.
4. Have a qualified person check the instrument for safety before
use.
Reshipment
Instructions
1. Use the original packing material when returning the switching
module to Racal Instruments for servicing. The original
shipping carton and the instrument’s plastic foam
will provide
the necessary support for safe reshipment.
2. If the original packing material is unavailable, wrap the
switching module in an ESD Shielding bag and use plastic
spray foam to surround and protect the instrument.
3. Reship in either the original or a new shipping carton.
Installation
Installation of the 1260-X121 Switching Module into a 1260-100X
Carrier assembly is described in the Installation section of the
1260-100X Adapt-a-Switch Carrier Manual.
Содержание 1260-X121
Страница 8: ...1260 X121 User Manual iv This page was left intentionally blank...
Страница 14: ...1260 X121 User Manual Specifications 1 6 Racal Instruments 2005 This page was intentionally left blank...
Страница 30: ...1260 X121 User Manual Module Operation 3 8 Racal Instruments 2005 This page was left intentionally blank...