![Quooker PRO3-VAQ B Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/quooker/pro3-vaq-b/pro3-vaq-b_installation-manual_3783377008.webp)
1 Tap through
work top
Push the tap through the hole in the
work top. Use the black ring (supplied
with the tap rings) when the tap hole is
bigger then 35 mm to center the tap.
2 Securing the tap
Set the tap to the desired position and
secure it with the metal ring and screw
ring supplied.
3 Securing tap
screws
Tighten the screws in the screw ring.
1
2
Fitting Nordic tap
• The total length of the hose between the boiling-water tap and tank is only
70 cm. The tank must therefore be fitted close to the tap. Extension hoses
are available in different lengths but are not normally required.
• The small fibre washers supplied with the tap rings are not required yet at
this point. One will be used for connecting the tap and tank hose (see
section E), the second one is a spare.
B
1
3