1
3
2
4
1. Fit hoses
Fit the hot, cold and mixer water hose to
the tap.
2. Tap through work top
Push the tap through the hole in the work
top.
3. Tighten the brass plate
Put the tap in the required position and
fully tighten the brass plate.
4. Securing tap screws
Tighten the screws in the screw ring.
Fitting Flex tap
• When installing the reservoir it is necessary to take into account that the Flex tap coupling
must be able to move up and down freely.
B
3