Section V - Operating Instructions

Auto Start/Stop Pilot Valve Operation

The pilot valve is factory set to each user’s 

requirement. Only adjust settings if the 

requirement was unknown at time of order 

or if shop air pressure differs enough from 

factory preset to cause the DEFENDER™ 

to not function properly. 

Pilot Valve Adjustment Procedure

There are two screws and two lock nuts on 

the pilot valve. 

Screw #4 is the cutout pressure (turn 

clockwise to increase 

and counter clockwise 

to decrease). Screw #2 

is the cut-in pressure 

(turn clockwise 

to increase and 

counter clockwise to 

decrease). Use 1/8” 

turn increments when 

adjusting screw #2. 

Screws #4 & #2 are 

interactive to each 

other. When one is 

adjusted it changes 

the setting of the other. 

When ever adjusting 

the Pilot Valve use 

small increments and 

keep the differential at 15-20 psig.

 NOTICE!

During  the  adjustment  process, 

the  valve  may  begin  opening  and 

closing rapidly, this happens when the 

differential  is  outside  the  designed 

pressure range.

If the valve has been disassembled the 

cut-in adjustment screw should be fully 

screwed in by turning it clockwise until 

it bottoms out. Turn the cut-in screw 

counterclockwise from the bottomed out 

state one half turn. From here proceed by 

adjusting screw #4 to desired pressure 

and then screw #2. Gradually adjust both 

screws, one at a time, until the proper set 

points have been reached. Once the set 

points are satisfactory, use screws #1 and 

#3 to lock the adjustment screws in place.

 NOTICE!

The  lever  at  the  end  opposite  the 

inlet  connection  can  be  used  to 

manually switch between the open/

closed states.

4

3

2

1

MANUAL

 

LOAD

/

UNLOAD

 

LEVER

PILOT

LINE

OUT

AIR

 

IN

Quincy Compressor-DEFENDER™ 

11

Содержание DEFENDER 7-2716 SCFH

Страница 1: ...tant safety information and should be made available to all personnel who operate and or maintain this product Carefully read this manual before attempting to operate or perform maintenance on this eq...

Страница 2: ......

Страница 3: ...densate Drain Connections 8 Nitrogen Piping Connections 8 Compressed Air Inlet Connection 8 Pre start Inspection 9 Initial Start up Adjustment 9 Nitrogen Purity Sampling Setup 9 Section V Operating In...

Страница 4: ......

Страница 5: ...in minor personal injury or property damage NOTICE Identifies important installation operation or maintenance information which is not hazard related DANGER This symbol identifies immediate hazards w...

Страница 6: ...s manual before attempting to operate the unit Although this unit is very simple to operate the user will be working with high pressure gas that must be handled with caution DANGER Compressed gas if h...

Страница 7: ...o not substantially fulfill performance requirements set forth in the Company literature and are manufactured in accordance with the Company s s p e c i f i c a t i o n s o r g o v e r n m e n t speci...

Страница 8: ...arbon carryover at or below 2 parts per billion Nitrogen System Description Inside the DEFENDER nitrogen generator the compressed air rst comes into contact with the membrane pre ltration system On St...

Страница 9: ...he analyzer Two pressure gauges are installed on the front panel One is for displaying inlet pressure and the other for system outlet pressure Example of a QUINCY DEFENDER FILTER 3 ACTIVATED CARBON FI...

Страница 10: ...depleted levels of oxygen is given below Effects Symptoms of Decreased oxygen Levels 15 19 Decreased ability to work s t r e n u o u s l y M a y i m p a i r coordination and may induce early symptoms...

Страница 11: ...he presence of oxygen rich air It is imperative that vented gas be discharged only in safe well ventilated areas If the unit is located in a poorly ventilated room the waste gas must be piped to a ven...

Страница 12: ...il and particle removing ltration is included in the nitrogen generator so pre ltration is not required Condensate Drain Connections A bulkhead connection is provided on the bottom of the panel to con...

Страница 13: ...re pressurize after each purge The nitrogen can be delivered to the system after the initial purging procedure Nitrogen Purity Sampling Setup 1 If the unit is equipped with the built in analyzer make...

Страница 14: ...t isolation valve and perform the purge process again If the tank remains pressurized during downtime weekends holidays etc this step is not required 3 Go Online After venting the system is ready to u...

Страница 15: ...ver adjusting the Pilot Valve use small increments and keep the differential at 15 20 psig NOTICE During the adjustment process the valve may begin opening and closing rapidly this happens when the di...

Страница 16: ...wn at time of order NOTICE If the purity is not at or better than required and the pressure and temperature going into the system are as required the Flow Purity Controller can be adjusted to meet the...

Страница 17: ...Stuff clean rag into lter bowl to keep unit clean while changing the elements 2 Unscrew the locking nut on the bottom of the element and discard the element Replace the element with a new one of the...

Страница 18: ...rom the top end of the carbon vessel to allow access to the carbon Drain the carbon into a container and replace with fresh carbon d Replace Hex bushing with screen attached using Te on tape on the th...

Страница 19: ...PERATION OF ALL SAFETY RELIEF VALVES ANNUALLY OR AT 8000 HOURS REPLACE ALL FILTER ELEMENTS ON THE UNIT CHANGE THE CARBON IN THE CARBON BED ANALYZER S SENSOR WILL NEED REPLACING EVERY 2 3 YEARS NOTICE...

Страница 20: ...1 CXNT 00030 COALESCING PRE FILTER NO 2 COMPLETE 1 ACNT 00030 ADSORBING PRE FILTER NO 3 COMPLETE DEFENDER N2GEN 270 520 PREMIUM FILTRATION QTY PART DESCRIPTION 1 CSNE 00030 COALESCING PRE FILTER ELEME...

Страница 21: ...PRE FILTER NO 1 COMPLETE 1 CXNT 00060 COALESCING PRE FILTER NO 2 COMPLETE 1 ACNT 00060 ADSORBING PRE FILTER NO 3 COMPLETE DEFENDER N2GEN 1800 PREMIUM FILTRATION QTY PART DESCRIPTION 1 CSNE 00150 COALE...

Страница 22: ...isk and storage charges may be applied at the discretion of Seller Accounts past due shall bare interest at the highest rate lawful to contract for but if there is no limit set by law such interest sh...

Страница 23: ...d to seller freight prepaid for inspection Seller warrants repaired or replaced parts of its own manufacture against defects in materials and workmanship under normal use and service for ninety 90 day...

Страница 24: ..._____________________________________________________ ____________________________________________________________________ ____________________________________________________________________ ________...

Страница 25: ......

Страница 26: ...te Alabama 36507 Phone 251 937 5900 Fax 251 937 1457 Nearest Distributor 888 424 7729 E mail info quincycompressor com The Science of Compressed Air quincycompressor com 2005 Quincy Compressor an EnPr...

Отзывы: