32
QUILL FALCON MOBILE 4 MAN AIR
BREATHING UNIT
- SETTING UP
1.
Wheel mobile 4 man air breathing unit into position and ensure foot brake is applied on the two front castors
4.
Connect mobile 4 man air breathing unit to mains electrical supply using 110volt power cable
5.
Connect breathing air lines for up to 4 operatives to mobile breathing unit
6.
Connect other end of air line(s) to mask harness(es)
7.
The Quill Falcon Mobile 4 Man Air Breathing Unit must be air tested and a certificate issued before use. Please
call Quill Falcon on +44 (0)1332 864664 to arrange your air test.
2.
Ensure the air valve is switched off, lever parallel to unit. Connect ¾” bull line to the main air inlet on
the mobile unit. Please use whip check safety devices provided.
3.
Connect other end of ¾ “ bull line to compressor, again please ensure whip check safety devices are used
Operatives
MuST
ensure they have read and understood the Quill Falcon Cyclone 4 Man Air Breathing Unit Safety
Guidelines before use
Quill_Falcon_Operators_Manual_v18.qxp_Layout 1 24/07/2019 16:00 Page 32