quiko Zebra Series Скачать руководство пользователя страница 6

www.quikoitaly.com

 

9. 

  

MAINTENANCE 

 
When  carrying  out  maintenance  operation  on  the  controller,  disconnect  it 
from  the  mains  power  supply.  The  actuator  does  not  require  periodical 
maintenance operations. 

• Check the safety devices of the gate and automation. 
• Periodically check the pushing force and correct the value of the electric 

torque in the control board if necessary. 

• In case of unsolved operation failures, disconnect the unit from the main 

power  supply  and  ask  for  the  intervention  of  qualified  personnel  (instal-
ler).  

When  the  unit  is  out  of  order,  activate  the  manual  release  to  perform 

manual opening and closing maneuvers. 

 
Anyone  using  the  automation  must  be  instructed  in  its  operation  and 
controls.  

 
 

 
 
 
 
 

10.  

 TECHNICAL FEATURES  

 

 

 

QK-Z600 

QK-Z300B 

QK-Z600B 

Power 

(50/60Hz) 

230Vac 

24Vdc 

24Vdc 

Power / 
Current 
Absorbed 

 

220W 

1,1A 

 

100W 

4A 

 

210W 

8A 

Max gate 
weight   

(kg) 

600 

 

300 

 

600 

Speed 

(m/min) 

12 

12 

12 

Protection 
rate 

(IP) 

54 

 

54 

 

54 

Thermal 
protection 

(°C) 

140 

 

 

Working 
temp. 

(°C) 

 -30/+70  

 

-30/+70 

 

-30/+70 

Working 
Cycle 

(%) 

60 

100 

100 

Weight   

(Kg) 

 

Содержание Zebra Series

Страница 1: ...www quikoitaly com USER MANUAL ZEBRA AUTOMATION FOR SLIDING GATES 230 110 24V USER MANUAL Made In Italy V05 2016 ...

Страница 2: ...fitted at the end of both closing and opening strokes If the gate has not been recently installed check the wear condition of all components Repair or replace faulty or worn parts Power supply cable The board power supply cable must be of the H 05 RN F type or equivalent The equivalent cable must guarantee permanent outside use rated voltage of 24 V 230 V maximum temperature on the cable surface o...

Страница 3: ...www quikoitaly com External measures Fig 1 3 POSITIONING FOR BASE PLATE Prepare the sub structure in order to fix base plate respecting approximately measures like Fig 1 Fig 2 ...

Страница 4: ...to the great plate through the eyelets associated Unlock the gear motors through appropriate release lever Fig 4 Fig 3 Fig 3 5 MANUAL OPENING Fig 4 In case of a power blackout it is possible to operate the gate in manual mode as shown in Fig 4 To unlock the engine insert the key into the seat and rotate clockwise until it stops about 5 laps To restore the engine block rotate the key counterclockwi...

Страница 5: ... made with great care Check that all the components are firmly anchored Control all the safeties work properly i e photocells pneumatic skirt etc Check the emergency maneuvers control Check the opening and closing maneuvers using the controls Check the control unit electronic logic in normal or customized operation 8 THE CONTROLS Any malfunction should be corrected immediately by a qualified speci...

Страница 6: ...s disconnect the unit from the main power supply and ask for the intervention of qualified personnel instal ler When the unit is out of order activate the manual release to perform manual opening and closing maneuvers Anyone using the automation must be instructed in its operation and controls 10 TECHNICAL FEATURES QK Z600 QK Z300B QK Z600B Power 50 60Hz 230Vac 24Vdc 24Vdc Power Current Absorbed 2...

Страница 7: ...operators of the ZEBRA serie are in compliance with the essential safety requirements of the regulations Electromagnetic Compatibility Directive 2004 108 EC Low Voltage Directive 2006 95 EC Machinery Directive 2006 42 EC and their amendments and modifications and with the regulations set forth by the National Legislative Body of the country in which the machinery is destined for use Sossano 01 09 ...

Страница 8: ...www quikoitaly com Made In Italy ...

Отзывы: