Q2BT11
21 August,
1981
MASS BALANCING ELEVATORS. In
preparation for testing on
turbocharged Revmasters and
possible A-65 thru C-85
installations, we have further
explored the very high speed area
of the Q2 operating envelope. We
have found that mass balancing the
elevators improves the ride
qualities at high speed. Therefore,
we are supplying to all builders
the drawings and hardware to mass
balance all Q2 elevators, and
recommend this before first flight.
See pages
...
for details.
ELEVATOR MASS BALANCING
.....
Locate the two Q2CSA11 arms and the molded lead weights.
.....
These elevator mass balance arms can be retrofitted to the elevator
control system even after the canard has been mounted to the fuselage.
This will allow a closer clearance with the fuselage sides and maximize
the available legroom. If the mass balance arms are installed prior to
mounting the canard, careful measurements must be made to assure
clearance with the fuselage sides.
.....
Begin by attaching a molded lead weight to each Q2CSA11 as shown.
.....
Next, remove the two bolts holding CS20 in position, and slide it
outboard through the CS14 phenolic bearing until a Q2CSA11 arm can be
slid onto the tube with the lead weight projecting forward. Reinstall the
bolts holding CS20 in position.
.....
Then remove the three bolts securing Q2CSA8 and slip it inboard
until the second Q2CSA11 arm can be slid on the outboard end inward with
the lead weight projecting forward. Reinstall the bolts holding Q2CSA8 in
place.
.....
Locate the Elevator Rigging template and jig the elevator in the
full trailing edge up position. With the elevator in this position, each
Q2CSA11 should be almost resting on the canard upper surface just inboard
of the fuselage. Note the piece of felt called out as a bumper stop. The
Q2CSA11's are located as far outboard as practical so as not to interfere
with pilot or passenger legroom. Verify that when the elevator is rotated
to full trailing edge down position, that the arc of each Q2CSA11 clears
the fuselage and all other components.
.....
Finally, return the elevator to the full trailing edge up position
with each Q2CSA11 resting almost on the canard, and drill in the one AN3-
12A bolt per side to attach the Q2CSA11's to Q2CSA8 and CS20.
.....
Leave the CS13 pitch control arm unattached from Q2CSA8, and remove
the two AN4-11A bolts attaching the universal joint to Q2CSA8 and CS20.
Remove the universal joint so that each elevator can rotate independently
of the other. Make sure that you have lubricated all of the bearing and
hinge points to reduce the system friction to a minimum. It is desirable
for each elevator to balance at 0 degrees to 2 degrees trailing edge up
with all painting and finishing complete. Remove lead, as necessary from
the molded lead weight until that position is reached. Each elevator
should rotate freely about the hinge points when given a slight nudge.
Содержание Q2 Lite
Страница 10: ...Q2 Plans Appendix Page v Q2 Plans Chapter 1 Page 1 1...
Страница 17: ...Q2 Plans Chapter 1 Page 1 3...
Страница 18: ......
Страница 25: ...CONTINUED ON NEXT PAGE PAGE 3 1 Q2 Plans Chapter 3 Page 3 02...
Страница 29: ...CONTINUED ON NEXT PAGE...
Страница 70: ...CONTINUED ON NEXT PAGE PAGE 3 15 Q2 Plans Chapter 3 Page 3 16...
Страница 71: ......
Страница 72: ......
Страница 74: ...CONTINUED ON NEXT PAGE PAGE 3 16 Q2 Plans Chapter 3 Page 3 17...
Страница 115: ...Q2 Plans Chapter 6 Page 6 02...
Страница 123: ...END OF CHAPTER PAGE 7 2 Q2 Plans Chapter 8 Page 8 01...
Страница 127: ...CONTINUED ON NEXT PAGE PAGE 8 2 Q2 Plans Chapter 8 Page 8 03...
Страница 134: ...END OF CHAPTER PAGE 8 5...
Страница 136: ...NOTE See Bottom and Top Main Wing Lamination Drawing for exact sizing of sparcaps A thru M...
Страница 137: ...CONTINUED ON NEXT PAGE PAGE 9 1 Q2 Plans Chapter 9 Page 9 02...
Страница 138: ...CONTINUED ON NEXT PAGE PAGE 9 2 Q2 Plans Chapter 9 Page 9 03...
Страница 154: ...CONTINUED ON NEXT PAGE PAGE 9 8 Q2 Plans Chapter 9 Page 9 09...
Страница 155: ......
Страница 161: ...PAGE 10 2 Q2 Plans Chapter 10 Page 10 03 PAGE 10 3...
Страница 167: ...PAGE 10 5...
Страница 174: ......
Страница 176: ...CONTINUED ON NEXT PAGE PAGE 10 9 Q2 Plans Chapter 10 Page 10 10...
Страница 185: ...PAGE 11 2...
Страница 187: ...CONTINUED ON NEXT PAGE PAGE 11 3...
Страница 192: ...CONTINUED ON NEXT PAGE PAGE 11 5...
Страница 196: ...PAGE 12 1...
Страница 198: ......
Страница 199: ......
Страница 200: ...PAGE 12 2...
Страница 206: ...PAGE 13 1 Q2 Plans Chapter 13 Page 13 02...
Страница 209: ...PAGE 13 2 Q2 Plans Chapter 13 Page 13 03...
Страница 211: ......
Страница 212: ......
Страница 213: ...PAGE 13 3...
Страница 216: ...END OF CHAPTER PAGE 13 4...
Страница 221: ...PAGE 14 2 Q2 Plans Chapter 14 Page 14 03...
Страница 225: ......
Страница 227: ...CONTINUED ON NEXT PAGE PAGE 14 4 Q2 Plans Chapter 14 Page 14 05...
Страница 230: ...CONTINUED ON NEXT PAGE PAGE 14 5 Q2 Plans Chapter 14 Page 14 06...
Страница 237: ......
Страница 238: ...CONTINUED ON NEXT PAGE PAGE 14 8...
Страница 240: ...PAGE 14 9...
Страница 242: ......
Страница 243: ...PAGE 14 10...
Страница 246: ...PAGE 15 1 Q2 Plans Chapter 15 Page 15 02...
Страница 249: ...END OF CHAPTER PAGE 15 2 Q2 Plans Chapter 16 Page 16 01 ENGINE INSTALLATION...
Страница 254: ...PAGE 16 2 Q2 Plans Chapter 16 Page 16 03...
Страница 257: ......
Страница 258: ...PAGE 16 3 Q2 Plans Chapter 16 Page 16 04...
Страница 263: ......
Страница 264: ...PAGE 16 5 Q2 Plans Chapter 16 Page 16 06...
Страница 266: ......
Страница 272: ......
Страница 273: ...PAGE 17 2...
Страница 276: ...END OF CHAPTER PAGE 17 3...
Страница 279: ...END OF CHAPTER PAGE 18 1...
Страница 284: ......
Страница 286: ......
Страница 288: ......
Страница 295: ...Congratulations on completing your very own Q2 PAGE 20 4...
Страница 296: ...Q2 Plans Chapter 20 Page 20 05...
Страница 297: ......
Страница 299: ......