QUICK7610
Operation Manual
9
range between T2 and T3.
T0
T0 is the valve temperature for bottom heater required by top heater when it heats up. Also it is the
first temperature of this technics process. When the work flow STARTs, the bottom heater starts to
heat up. After reaching the T0, the top heater STARTs to heat up.
TB
、
Tb
、
TC
TB: The setting temperature of bottom preheating Tb: Real-time temperature of bottom heating TC:
Real-time temperature of top heating
T1
It is the heat preservation starting temperature of reflow soldering. It is the second temperature of
this technics process. The temperature rises to T1 with a proper speed the component permits. Use
the
“
UP” and “DOWN” key to set the value of T1 in parameter setting interface.
T2
It is the temperature when finish the heat preservation of reflow soldering. The pre-heating
temperature rises to T2, after the time of S1 finishes. Within this time, PCB and component
pre-heating is finished and the solder is activated. Use the
“
UP” or “DOWN” key to set the value of
T2 in parameter setting interface.
T3
It is the peak value temperature of reflow soldering. When the temperature reaches T2, the
temperature equably rises to T3 with a definite raising speed. The soldering or de-soldering will be
finished when the temperature reaches to the peak value and performs the next step. Use the
“
UP”
or “DOWN” key to set the value of T3 in parameter setting interface.
TL
Melting temperature of solder. At this temperature, the solder starts to melt down and turn into liquid.
S1
Heating time rises from T1 to T2. User can set the value in the range of 0~300s.
S2
Heating time rises from T2 to T3. User can set the value in the range of 0~300s.
S3
Prolonged heating time (Heat preservation time) after the temperature reach T3, and user can also
set the value in the range of 0~300s.
Unit
It’s able to set the unit of display temperature during work flow. In parameter modifying, use
“
UP”
and “DOWN” keys to set the value of it.
Содержание QUICK7610
Страница 19: ......