![Quick MC2 X19 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/quick/mc2-x19/mc2-x19_installation-and-use-manual_3870758016.webp)
16
EN
INSTALLATION AND USE MANUAL
QUICK MC² X19
REV002A
5 - Handling and Transportation
5.0 - General instructions and precautions
The weight to be considered for lifting the
MC²
X19
stabilizer is
553 kg (1219 lb)
The stabilizer must be handled and transported by qualified personnel that can anchor the loads in compliance
with local safety regulations in the workplace.
• The stabilizer must be lifted by means of a suitable hoist, using the lifting straps properly secured to the supports
on the base.
• While removing the stabilizer from its packaging or while lifting it, it is necessary to work with caution, paying attention to
NOT cause damage to the equipment or allow it to hit the ground. Before installation on board, we recommend resting the
unit on a shockproof surface (e.g. wood, cardboard, cloth)
• Prevent electrical components from coming in contact with any surface or object, as this could damage such components.
• Do not scratch or cut on the painted finish that protects the stabilizer.
5.1 - Crate Removal
1.
Remove the top cover of the crate.
2.
Remove the side panels of the crate.
2.
1.
Содержание MC2 X19
Страница 1: ...REV 002A ANTI ROLL GYRO STABILIZER INSTALLATION AND USE MANUAL EN page 3 MARCH 2020...
Страница 2: ...PAGE INTENTIONALLY BLANK...
Страница 6: ...PAGE INTENTIONALLY BLANK...
Страница 39: ...PAGE INTENTIONALLY BLANK...