11
Ita
lia
no
En
gli
sh
Fr
an
ça
is
D
eu
tsc
h
Commissioning
1. Remove the cup warmer lid (
f
). Take out the delivery and discharge pipes
and withdraw the water tank.
2. Fill the water tank (
g
), with drinking water, softened if possible.
3. Return the water tank to its original position.
4. Switch on the machine bringing the switch (
h
) to position 1; the light (
i
)
switches on.
5. Raise the group lever (
b
) to delivery position, wait until approx. ½ litre of
water pours out from the group (boiler full) then lower the lever.
6. Set the switch (
h
) in position 2 to start the boiler heating; light (
j
) on.
7. When the heater light (
j
) switches off, the machine is ready to deliver the
coffee.
Important
: Make sure that the silicon tubes are completely immersed in the
water, and are not bent.
Coffee brew
1. Remove the filter (
c
) holder from its seat, turning it clockwise.
2. Fill the filter with one or two doses of coffee (according to the filter
inserted);
3. Press the coffee with the presser.
4. Place the filter holder to its seat, turning it anti-clockwise.
5. Place the cups under the corresponding outlets under the filter holder.
6. Lift the coffee delivery lever (
b
) after a few seconds the coffee starts to
brew. When the desired amount of coffee has been delivered, lower the
group lever.
Boiler temperature adjustment
Boiler temperature management is by means of a specific PID; for the settings,
see
“THERMOPID SETTING AND FUNCTIONING for CAROLA model”.
Содержание MILANO 0980
Страница 32: ...32 Ita lia no En gli sh Fr an a is D eu tsc h 0985 AQUILA E AQUILA PID...
Страница 44: ...44 Ita lia no En gli sh Fr an a is D eu tsc h 0992 QM67 2 BOILER PID...
Страница 54: ...54 Ita lia no En gli sh Fr an a is D eu tsc h 0995 VETRANO 2 BOILER PID...
Страница 61: ...61 Ita lia no En gli sh Fr an a is D eu tsc h 995 VETRANO DOSATA 2 BOILER PID...