![Quattroflow QF1200 Скачать руководство пользователя страница 21](http://html2.mh-extra.com/html/quattroflow/qf1200/qf1200_installation-operation-and-troubleshooting-instructions_3557382021.webp)
Quattroflow Installation, Operation & Troubleshooting Guide
Rev. 0
Page 21 of 25
www.quattroflow.com
7.2
Full drainability: Vertical position of the pump (pump chamber downwards)
To reach a full drainability of Quattroflow Pump chambers there is the possibly to mount the complete pump
drive and pump head in vertically position. There are some figures below which show this orientation
exemplary.
For the reason that the pump chamber shows downwards the medium will flow out of the inlet and outlet
port caused by the gravitation.
For all pump sizes we recommend installing valves both at the inlet and the outlet site of the pump
chamber for draining after the process or cleaning procedure is finished.
For new or existing Quattroflow pump with gear motors, there are some points which have
to be considered for horizontal mounting. Please contact the support team to get further
information.
QF150
QF1200
Full drainability
Pump drive
Vertically,
Pump chamber
downwards
Figure 7 QF150 and QF1200 orientation for full drainability.
Please contact the support team to get more information on vertical installation of QF150
and QF1200 pumps.
QF5050
Full drainability
Complete pump is
rotated,
Pump chamber
downwards
Figure 8 QF5050 orientation for full drainability.
There is nothing else to consider mounding the QF5050 pump as shown above.
QF5050 pump is designed to operate in all orientations.