2
3
NOTE:
THE TAP MUST BE SIT-
ED ABOVE OR ADJACENT TO THE
QST553-B (BOILER CONTROL UNIT),
CLOSE ENOUGH SO THAT THE COM-
MUNICATION CABLE FROM THE
SMARTTAP™ IS NOT STRETCHED
WHEN IT PLUGS INTO THE BACK LEFT
SIDE OF THE BOILER.
2.
Cold Water Supply:
Make sure you install
an isolation valve on the cold water supply to
ensure serviceability in the future.
Minimum
recommended operating pressure 3bar/45p-
si. Max recommended operating pressure
4bar/60psi.
3.
Approved Sanitary Drain:
Ideally located
under the sink (see Fig 2.1), unless QSTD will be
installed with
INTEGRATED DRIP-TRAY
(see
Fig 2.2) drain system will vary.
An approved type AA fitting (air gap) must be
used for the venturi waste. Either a trapped up-
stand or drain clamp can be used, or equivalent
connection approved in the country or state
of installation. Fittings are provided and can be
used if applicable for your installation.
4.
Power:
The system requires two (2) dedicat-
ed 220V/13 amp circuits to run your Quatreau.
1. Tools required:
a.
Jigsaw
- to cut ventilation under chiller
into the cupboard base.
b.
Drill and bits
suited to the work surface
c. SmartTap™ 1 x 30mm core bit
(or closest match)
d. SmartTap™ with Drain 1x 150mm core
bit
(or closest match)
* 30mm core bit for
the buttons.
1. Your systems have been carefully packaged.
If the box is damaged upon delivery,
you
should photograph the damage and remove
the contents for inspection before signing the
delivery note.
There will be 2 or 3 boxes depending on the
model you have purchased.
a. Quatreau SmartTap™ (faucet)
b. Quatreau Water Heater
c. Quatreau Chiller / Chiller Carbonator
2. Open and inspect the Quatreau SmartTap™
to inspect the components and installation kit.
Use the packaging to prevent damage until
ready to fit the work surface.
The heater control unit always sits to the
right-hand side of the cupboard with the
chiller on the left.
Cut down each side of the box to reveal the
systems so that you don’t have to lift them out
of the box. Install the water heater on the right-
hand side of the cupboard after you’ve installed
the SmartTap™.
This item weighs 44lbs (19.95kg) Please take
care when moving or lifting. The sides and
corners are hard and will damage furniture if
knocked.
Leave the system on the protective packaging
until ready to install.
Please open and inspect the chiller carbonator,
then leave it in its base until ready to install.
1. The Quatreau SmartTap™ will come as a
stand-alone tap or integrated into a drip-tray.
With the relevant cutting template enclosed
with your product, choose the most suitable
position for the tap.
2. Depending upon the surface, you will need
special cutting equipment. It is required to use
a diamond-tipped core bit for granite or mar-
ble. For wood or MDF or polymer type surface,
a wood bit will normally be adequate. Always
check with the worksurface manufacturer and
ask what type of bit can be used.
3. Decide where the tap is going to sit. Note that
the control panel on the drip tray is on the right-
hand side of the tap. Ensure that the location
you choose is suitable and that you can reach
the controls without needing to stretch while
ensuring that the user will not have to reach
through the stream of water to operate the
tap.
QUATREAU SMARTTAP™
PRE-INSTALLATION CHECK
SECTION ONE
UNPACKING YOUR EQUIPMENT
PRE-INSTALLATION CHECKLIST
UNPACKING YOUR EQUIPMENT
FRAGILE
FRAGILE
1
FRAGILE
2
SECTION TWO
INSTALLING THE QUATREAU
SMARTTAP™