Pressure readings are most accurately obtained if taken in the discharge ducting of the fan coil unit 
 
Where dampers are fitted in the ductwork they should be used for balancing purposes only and not to regulate the air volume. 
Where possible this unit should be adjusted at the fan coil unit. 
 

 
Electric Air Heaters [if fitted] 

Wiring should be in accordance with I.E.E regulations and local by-laws and wired to the appropriate wiring details issued with the 
unit. Ensure that all cables and connectors used are suitable for the load being carried. 
Important: the fans unit

’s must be running before switching on the electric heater elements. 

The fan control must be interlocked with the heater control. 
Electric heater elements are fitted with a thermal auto reset high temperature cut outs switches on each element, and a manual 
reset safety thermostat located on the fan deck. 
Before switching on the electric heaters ensure the correct airflow through the unit, a reduced or no air flow will case the thermal cut 
out protection switches to operate. 
 

 
IMPORTANT 
If the manual re-set thermostat cuts out isolate all power to the electric heater units before resetting, the cause of the cut 
out most be determined and rectified before re setting the manual cut out thermostat. 
 
 

 
SERVICE AND MAINENANCE 

 

GENERAL 

 
This section of the manual deals with the requirements for service and maintenance of Quartz fan coil units and must be read 
before any maintenance is attempted. 
 

WARNING: It is essential that before any work is carried out the unit is isolated externally from the electrical supply. 

 
 
For full warranty details see TEV Limited Terms and Conditions for the supply of goods and/or services at 

www.tevlimited.com/terms.html

 

  
 
 
QUARTZ Technical Helpline 01484 405630 Monday to Friday 9am 

– 4.30pm 

 

 
 
 

 
 
FAN MOTOR

 

 
A regular check on the fan/motor assembly is advisable to ascertain if the motor is overheating and that the fan impeller is free 
running and has not sustained any damage. If any overheating is occurring, check that the full load current of the motor is within the 
nameplate rated value, the impeller is running free and that there is no obstruction upstream of the fan causing a high resistance 
with consequent lack of airflow. Also check that the external resistance of the unit is not low, thus causing an increase in power 
input. 
 
Check security of fan fixing bolts. 
 

FAN IMPELLOR 

 
Check the condition of the impellor blades any debris deposited on the blades should be removed using a soft brush; take care not 
to damage the blades. 
 

TO REMOVE FAN ASSEMBLY THE FOLLOWING PROCEDURE MUST BE ADOPTED. 

 

1.  Isolate electrical supply. 
2.  Loosen the screws securing the fan access panel to the bottom of the unit this will allow the panel slide in the keyhole 

slots and can be removed. Move panel to a safe place to avoid damaging. 

3.  Disconnect wiring loom from terminal block on side of fan scroll. 
4.  Remove two off M6 screws connecting fan scroll to bulkhead. 

Содержание AMB 1

Страница 1: ...Units Designed for Ceiling or Void Mounting INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS TEV Ltd Armytage Road Brighouse West Yorkshire United Kingdom HD6 1QF UK Tel 01484 405630 Fax 01484 405620...

Страница 2: ...e used 4 It is manually isolated from the electrical mains supply 5 Electrical equipment is earthed to comply with IEE regulations and local by laws 6 All electrical work must be carried out by a Qual...

Страница 3: ...ntation 5 Filters 5 INSTALLATION Dimensional details 6 Pre Unit Installation 7 Fitting unit 7 Fitting float switch 7 9 Connection of ductwork 9 COMMISIONING Airside Measuring and Balancing 10 Electric...

Страница 4: ...s AC Speed control of the fan motors is achieved by means of a multitapped auto transformer which is wired to a three speed and fine adjustment switches Supplied with continuous filament media filters...

Страница 5: ...aged Maintenance It is essential that the following instructions as laid down in this section are carried out and maintained during the period of storage before commissioning Internal Surfaces If duct...

Страница 6: ...B Spigot Options Weight approx Kg AMB 1 630 595 1 2 3 4 37 AMB 2 880 845 1 2 3 4 45 AMB 3 1230 1195 1 2 3 4 5 55 AMB 4 1230 1195 1 2 3 4 5 60 AMB 5 1430 1395 1 2 3 4 5 70 AMB 6 1430 1395 1 2 3 4 5 75...

Страница 7: ...unit up using a spirit level checking to ensure the unit sits level in both directions the drip tray is designed with a built in fall to ensure condensation runs to the drain connection 7 Use nuts and...

Страница 8: ...nt pipe is higher than the water level in the drip tray 13 The drain pipe from the condensate pump must be run to a common drain It is important that any condensate pump installed must be in accordanc...

Страница 9: ...Typical installation showing ductwork connected to unit The ducts should be pushed fully over the spigot up to the outer casing of the unit and secured to the spigot with screws once fitted they shou...

Страница 10: ...ation of the condensation pump by pouring a small amount of water into the drain tray and ensure the pump clears any water and operates any alarms etc 13 Start the fan and blow through the system thor...

Страница 11: ...ice and maintenance of Quartz fan coil units and must be read before any maintenance is attempted WARNING It is essential that before any work is carried out the unit is isolated externally from the e...

Страница 12: ...ws and slide element upwards letting the screw head pass through the key hole slots 5 Remove wires from element take note of terminal connections used 6 Remove elements from the unit must be replaced...

Страница 13: ...irty filters will reduce the air volume handled by the unit thus adversely affecting its performance The length of time between cleaning of filters is dependant upon the environment A six to twelve mo...

Страница 14: ...emperatures Alternatively Electric Heating elements are available and can be supplied wired for single phase or three phase supply as appropriate or as specified Multiple units fitted on the same syst...

Отзывы: