Installation
61
Figure 59
Unpack 5U84 Chassis
The railkit and accessories box is located immediately below the box lid (
).
CAUTION:
With four persons—positioned one at each corner of the chassis—grip the straps
securely by the loops, and lift the chassis out of the box, using appropriate lifting technique. Place the
chassis in a static-protected area.
NOTE:
If your product model uses CNC ports for FC or iSCSI, you must locate and install the SFPs.
See also
Required Tools
Required tools include:
•
Flat blade screwdriver
•
Torx T10/T20 bits for locks and select CRU replacement
Содержание QXS G2 Series
Страница 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Страница 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Страница 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Страница 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Страница 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Страница 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...