206 QXS G2 Hardware Installation and Maintenance Guide
a
Push the release latch down and hold it in place (detail No.1).
Figure 169
Removing Fan-1
b
With your other hand, grasp the handle and pull the fan outward (
Supporting the fan with both hands, remove it from the chassis. See also
Figure 170
Removing Fan-2
IMPORTANT:
The fan slot must not be empty for more than 2 minutes while the chassis is powered.
Installing a 5U84 System Fan
1
You can hotswap the replacement of a single fan; however, if replacing multiple fans, the chassis
must be powered off via an orderly shutdown using the management interfaces.
2
Orient the fan for insertion into the target slot on the chassis rear panel, as shown in
Содержание QXS G2 Series
Страница 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Страница 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Страница 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Страница 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Страница 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Страница 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...