1U Rackmount Quick Start Guide
3
5
Loosen the captive thumbscrew securing the top cover
(thumbscrew is located on back panel). Slide the cover
toward the back of the 1U Rackmount about 1/2 inch
to loosen it from the front clips. Lift the top cover off.
See
figure 2
.
Figure 2 Removing the Top Cover
6
Inside the chassis, remove the two screws securing the
front filler panel to the 1U Rackmount walls using a
#2 PHILLIPS screwdriver. Lift out the filler panel and
discard. See
figure 3
.
7
Remove the foam insert from the bulkhead. See
figure 3
.
8
Remove the two mounting bracket screws using a
#1 PHILLIPS screwdriver. Lift off the mounting brackets.
See
figure 3
.
Figure 3 Items Inside Chassis
Top cover
thumbscrew
Foam
insert
Filler panel
Mounting
bracket
screws
Mounting
brackets
Filler panel
screw
9
Connect the internal SCSI cable, SCSI ID cable, and
power cable to the back of the second tape drive.
Follow these specific instructions for your tape drive:
•
DAT 72, DLT-V4, and DLT VS160:
Use the keyed
SCSI ID connector labeled “DDS”. The purple wire
on the SCSI ID cable must be connected to the
upper right SCSI ID pin. See
figure 4
and
figure 5
.
•
LTO-2 HH:
Use the SCSI ID cable labeled “LTO”.
Connect the SCSI ID cable to the 12 right-most
pins. (The eight left-most pins are not used.) The
purple wire must be in the upper left position. See
figure 6
.
•
LTO-3 HH:
Use the SCSI ID cable labeled “LTO”. The
purple wire must be in the upper left position. See
figure 7
.
Figure 4 DAT 72 Connections
''6
Purple wire
location
Содержание LTO 1U
Страница 24: ...1U 24 5 DLT VS160 DLT V4 6 LTO 2 HH 6 72 7 LTO 3 HH 10 2 4 8 8 11 9 72...
Страница 29: ...1U Rackmount 29 6 LTO 2 HH 7 LTO 3 HH 10 8 72 72 8 11 9 9 12 1U Rackmount 1U Rackmount 10...
Страница 34: ...1U Rackmount 34 6 LTO 2 HH 7 LTO 3 HH 10 8 72 72 8 11 9 9 12 1U Rackmount 1U Rackmount 10 10...