background image

ActiveScale

6-68926-0

4

, Rev. A

with ActiveScale OS 

6.

1.0

 software

P100E3 Site Requirements Guide

Содержание ActiveScale P100E3

Страница 1: ...ActiveScale 6 68926 04 Rev A with ActiveScale OS 6 1 0 software P100E3 Site Requirements Guide...

Страница 2: ...gistered trademarks or trademarks of Quantum Corporation and its affiliates in the United States and or other countries All other trademarks are the property of their respective owners Quantum specifi...

Страница 3: ...P100E3 site requirements 11 2 1 Warnings and cautions 11 2 2 Environmental requirements 11 2 2 1 Airflow requirements 11 2 3 Rack requirements 11 2 4 Delivery route inspection 12 2 4 1 Walking path i...

Страница 4: ...ActiveScale P100E3 Site Requirements Guide 4...

Страница 5: ...Guide List of tables 5 List of tables Table 1 1 System specification summary 10 Table 2 1 Footprint of packaging 12 Table 2 3 Space requirement specifications 13 Table 2 2 Footprint of components 13 T...

Страница 6: ...ActiveScale P100E3 Site Requirements Guide List of tables 6...

Страница 7: ...ActiveScale P100E3 Site Requirements Guide List of figures 7 List of figures Figure 1 1 ActiveScale P100E3 system layout 9 Figure 2 1 Minimum servicing space required 13...

Страница 8: ...ActiveScale P100E3 Site Requirements Guide List of figures 8...

Страница 9: ...tem needs to make before integrating the system at the site where the system will be deployed This document should be used by the systems architect system planner and site manager and teams which plan...

Страница 10: ...irements typical maximum N A 3 node 1 85 to 2 03 kW Relative humidity 20 to 95 non condensing 20 to 80 non condensing Relative humidity gradient 30 per hour maximum 30 per hour maximum System width an...

Страница 11: ...ge due to overheating 2 2 1 Airflow requirements Use the following guidelines to ensure proper system airflow The airflow in and out of the equipment must not be restricted Controlled air conditioners...

Страница 12: ...path inspection Walking paths must be clear of obstructions and wide enough to allow passage of the packaged system 44 5in x 51in to the location where it will be unpacked The following is a list of o...

Страница 13: ...Before moving the system verify that the rack can support the dynamic load of the system weight during movement 2 6 Servicing space requirements Important Mounting a PDU or other equipment vertically...

Страница 14: ...cessive current spike created by all the components powering on simultaneously To prevent the potentially negative effects of excessive inrush current on the system Quantum Corporation recommends sele...

Страница 15: ...iber These cables must comply with the Ethernet 10GBASE SR standard Ensure that you do not exceed the specified maximum 10GBASE SR cable length for the cable type chosen For example do not exceed a le...

Страница 16: ...ActiveScale P100E3 Site Requirements Guide 16...

Страница 17: ...ther assistance contact the Quantum Corporation Support Center Region Support Contact North America 1 800 284 5101 toll free 1 720 249 5700 EMEA 1 800 7826 8888 toll free 49 6131 324 185 Asia Pacific...

Отзывы: