Quantech
88
Section 5 - Technical data
Form QTC4-NM2
Issue date: 05/12/2023
Elastomeric isolator installation
Read the following instructions before beginning
installation:
1. Isolators are shipped fully assembled. Position in
accordance with the submittal drawings or as oth-
erwise recommended.
2.
Set the isolators on the floor, housekeeping pad
or subbase, ensuring that all isolator lines match
the equipment mounting holes. Install the isola-
tor base (A) on a level surface. Shim or grout as
required, leveling all isolator bases to the same el-
evation. 0.03125 of an inch maximum difference
can be tolerated.
3. Bolt or anchor all isolators to the supporting struc-
ture using the base through holes (B).
4. Remove the top bolt and top washer. Place the
equipment on top of the isolators so that the
mounting holes in the equipment or base line up
with the threaded hole (C).
5. Reinstall the top bolt and washer and tighten
down.
LD13762C
D
D
CL
SECTION D-D
CL
(B)
(B)
(A)
(C)
Top bolt
Top washer
Section D-D
Figure 39 -
Elastomeric isolator
Содержание QTC40160
Страница 22: ...Quantech 22 Form QTC4 NM2 Issue date 05 12 2023 This page is intentionally left blank...
Страница 94: ...Quantech 94 Form QTC4 NM2 Issue date 05 12 2023 This page is intentionally left blank...
Страница 100: ...Quantech 100 Form QTC4 NM2 Issue date 05 12 2023 This page is intentionally left blank...
Страница 158: ...Quantech 158 Form QTC4 NM2 Issue date 05 12 2023 This page is intentionally left blank...
Страница 187: ...Quantech 187 Form QTC4 NM2 Issue date 05 12 2023 This page is intentionally left blank...