manualshive.com logo in svg
background image

‘ 

Installation Manual 

Document No. 501601 Rev. 07-01-19

 

XLS Series of Tape Libraries

Содержание XLS Series

Страница 1: ...Installation Manual Document No 501601 Rev 07 01 19 XLS Series of Tape Libraries...

Страница 2: ...nt is error free or that it is accurate with regard to any specification Qualstar reserves the right to modify the design or specification without notice This specification may not be construed as a c...

Страница 3: ...to comply with FCC Rules Use shielded cables when connecting this device to others European Union Directive 89 336 EEC and Standard EN55022 Electromagnetic Compatibility This product has been tested a...

Страница 4: ...oHS Restriction of the use of certain hazardous substances in electrical and electronic equipment in accordance with the European Directive The compliance date is July 1 2006 at which time Qualstar wi...

Страница 5: ...Overview 2 2 2 2 Installation Check List 2 4 3 Unpacking the XLS 3 1 3 1 Inspecting the Shipment 3 1 3 2 Unpacking the XLS 3 3 3 3 Removing the Shipment Locks on the Handler 3 14 3 4 Unpacking the Eq...

Страница 6: ...Panel 6 13 7 Installing an Equipment Rack 7 1 7 1 Installing the 8U Rack Hardware 7 2 7 2 Installing the Rack into the XLS 832700 7 5 7 3 Installing a Rack into the XLS 820500 or XLS 812300 7 9 7 4 Th...

Страница 7: ...ndling Cartridges 13 3 13 3 Preparing Cartridges 13 4 13 4 Installing Cartridges in Cartridge Slots 13 5 14 Scanning the Fiducials and Inventory 14 1 14 1 Before You Begin 14 1 14 2 Scanning and Calib...

Страница 8: ...VIII 501601 Rev 07 01 19 Table of Contents A 6 Addresses for the Media Expansion Modules MEMs A 18 Glossary GL 1 Index IN 1...

Страница 9: ...ives a variable number of cartridge storage slots a high speed robotic mechanism for moving cartridges between the tape drives and the storage slots and I O ports for importing and exporting cartridge...

Страница 10: ...About the XLS The XLS 89000 also referred to as a MEM1 holds an additional 1 075 cartridges while the XLS 85000 also referred to as a MEM2 contains 535 cartridges Figure 1 1 LRM with two MEM1s XLS 832...

Страница 11: ...I O ports As an option one or two Media Expansion Modules MEMs can be installed on the sides of the XLS 8161100 See Section 1 3 on page 1 20 for more information Doors 2 Carousels 2 Touch screen Stat...

Страница 12: ...O ports As an option one or two Media Expansion Modules MEMs can be installed on the sides of the XLS 832700 See Section 1 3 on page 1 20 for more information Doors 2 Cartridge slots Touch screen Sta...

Страница 13: ...to four 10 slot I O ports As an option one or two Media Expansion Modules MEMs can be installed on the sides of the XLS 820500 See Section 1 3 on page 1 20 for more information Cartridge slots Touch...

Страница 14: ...ot I O ports As an option expansion pods can be installed on either side of the library with each expansion pod adding 120 cartridge slots Cartridge slots Touch screen Status LEDs I O ports 1 or 2 Doo...

Страница 15: ...uch screen and LEDs see Section 1 2 2 on page 1 10 Robotic handler and barcode reader see Section 1 2 3 on page 1 12 Tape drives see Section 1 2 4 on page 1 14 I O ports see Section 1 2 5 on page 1 15...

Страница 16: ...ridge bays Power PC bay Figure 1 7 Rear view of the LRM XLS 832700 shown 1 2 1 Power PC Bay Figure 1 7 shows the location of the power PC bay at the rear of the LRM The power PC bay houses the power c...

Страница 17: ...er bay components System Controller Shown in Figure 1 9 on page 1 10 the system controller occupies the right side of the power PC bay and consists of a Linux based computer that controls the library...

Страница 18: ...connectors EMI shield Serial Ethernet connectors Figure 1 9 System controller components in the power PC bay 1 2 2 Touch Screen and LEDs Shown in Figure 1 10 each LRM includes a touch screen used to...

Страница 19: ...interface can be accessed locally from the touch screen or remotely over Ethernet using a standard Internet browser The interface and available functions are the same regardless of how they are access...

Страница 20: ...handler that actually picks and places the cartridges in the storage slots and tape drives The gripper moves along four axes as follows The X axis is the horizontal axis The Y axis is the vertical ax...

Страница 21: ...quired only when the library is installed or when certain service procedures are performed Inventory scan During an inventory scan the barcode reader scans each slot to determine which ones contain ca...

Страница 22: ...rive enclosed in a drive carrier Figure 1 14 Fibre Channel tape drive assembly rear view Two models of tape drives are available SCSI tape drive assemblies include dual SCSI HD68 connectors and a sing...

Страница 23: ...hich holds four tape drives can be exchanged with a cartridge bay which holds 30 cartridges and vice versa For safety reasons four tape drive or drive filler assemblies see Figure 1 16 must be install...

Страница 24: ...the model the XLS can include one two or four I O ports For each I O port that is not installed the library includes 10 additional cartridge storage slots called fixed port assemblies Figure 1 17 I O...

Страница 25: ...available not available not available Door slots 0 110 or 220 0 110 or 220 0 or 110 not available Fixed port slots up to 30 assumes only one I O port is installed up to 20 assumes only one I O port i...

Страница 26: ...e one door The XLS 89000 MEM has two doors while the XLS 85000 has a single door All doors have windows for viewing robot operations the front windows in the LRM are blocked if the optional door slots...

Страница 27: ...and automatically scans the cartridges and drives in the affected area as soon as all doors are closed 1 2 8 Equipment Rack Shown in Figure 1 20 the LRM excluding 8161100 provides space in the back fo...

Страница 28: ...000 MEM1 can accommodate 1 075 cartridges while the XLS 85000 MEM2 can store 535 cartridges The XLS 8161100 XLS 832700 and the XLS 820500 can be expanded by adding one or two of either the XLS 89000 o...

Страница 29: ...Wheels 4 Figure 1 22 Front view of an XLS 85000 Media Expansion Module MEM2 A MEM derives its power and control from an attached LRM The carousel can rotate in either direction and the handler from an...

Страница 30: ...to SCSI or Fibre Channel host computers Chapter 10 Applying Power and Logging Into X Link Instructions for performing the initial power on and logging into X Link from the touch screen Chapter 11 Con...

Страница 31: ...s and places the cartridges Refer to the Glossary for the definitions of other specialized terminology 1 5 2 Typographic Conventions This manual uses the following typographic conventions For X Link o...

Страница 32: ...Personal injury may result if you do not fully comply with the handling operating or service instructions found in a Warning notice CAUTION Equipment damage or loss of data may result if you do not fu...

Страница 33: ...LS 832700 and XLS 8161100 XLS 812300 Library Product Specification 501700 Specifications for the XLS 812300 XLS Library Site Planning Guide 501604 Information for preparing a site for XLS installation...

Страница 34: ...manuals index html where qualstarxls is the default name for the physical library See Figure 1 23 Figure 1 23 Accessing the online manuals Internet Explorer shown Important If you have changed the nam...

Страница 35: ...allation Manual 1 27 5 Select the manual you are interested in Assuming that Adobe Acrobat or Acrobat Reader is installed on your system the PDF file opens See Figure 1 25 Figure 1 25 PDF file of exam...

Страница 36: ...ibrary contact an authorized reseller or Qualstar Technical Support Qualstar Corporation 1267 Flynn Road Camarillo CA 93012 Monday Friday 7 00 AM to 4 00 PM PST Phone 805 416 7055 Toll Free 877 886 27...

Страница 37: ...cessories you need to complete the installation Important Before starting the installation be sure that you have access to any planning diagrams or documents created when determining what XLS equipmen...

Страница 38: ...gripper to MEM if installed Check hardware configuration Configure physical library Set target IDs Define library settings and policies Specify port IDs LUNs operating mode Request cartridge slots and...

Страница 39: ...er 10 Applying Power and Logging Into X Link 8 Connect the library to a network or standalone computer align the gripper to the MEM if installed check the hardware configuration and configure the phys...

Страница 40: ...00 Tape drive assemblies Qualstar The tape drives are installed in drive carriers at the factory and are shipped separately Drive filler assemblies Qualstar All unused tape drive locations require dri...

Страница 41: ...Barcode Labels To obtain this document go to www qualstar com and click on the Support tab Pre printed barcode labels which are both human and machine readable are available from a number of sources...

Страница 42: ...e the shipping restraints from the unit 3 4 inch open end wrench Installer 3 8 inch Allen wrench Installer 5 16 inch Allen wrench Installer Ratchet with 1 2 inch deep socket Installer 2 Phillips screw...

Страница 43: ...ex wrench included in the accessory box Scissors Procedure overview Unpacking the XLS involves the following steps Inspecting the shipment see Section 3 1 Unpacking the XLS see Section 3 2 on page 3 3...

Страница 44: ...g transport See Figure 3 1 Blue arrow indicates shipment was tipped Clear arrow indicates shipment is okay Figure 3 1 Example Tip N Tell indicators 3 Inspect the cartons and pallets for obvious damage...

Страница 45: ...5 Roll the unit into position Section 3 2 5 on page 3 13 Table 3 1 Overview of unpacking the XLS 3 2 1 Remove the Packaging To remove the packaging follow these steps 1 Using a pallet jack or forklif...

Страница 46: ...the plastic sheeting surrounding the cardboard See Figure 3 2 Figure 3 2 XLS in plastic sheeting covered shipping carton 3 Lift the cardboard cap off the top 4 Using a Phillips screwdriver remove the...

Страница 47: ...e 3 3 Figure 3 3 XLS 832700 with crating material removed 6 Visually inspect the unpacked equipment for obvious shipping damage such as dented or scratched surfaces Report any damage to the carrier 3...

Страница 48: ...strap from the upper and lower eye bolts 4 Repeat steps 2 and 3 to remove the other straps 5 Using a 1 2 inch socket or open end wrench remove the four shipping brackets from the top of the unit See F...

Страница 49: ...ps See Figure 3 6 Figure 3 6 Location of ramps 2 Slide the ramps out from under the unit 3 Locate the ramp slots on the pallet Important The ramp includes two sets of slots Be sure to use the correct...

Страница 50: ...ecurely attach the ramps to the pallet and make sure they are positioned directly in front of the wheels 3 2 4 Remove the Shipping Restraints The LRMs and MEMs are bolted to the pallet with three or f...

Страница 51: ...traints 2 Using a 5 16 inch hex wrench included in the accessory box remove the shipping restraints 3 Open the doors on the front of the LRM 4 Locate the two shipping restraints at the front Figure 3...

Страница 52: ...ation of the back shipping restraints 2 Using a 5 16 inch hex wrench included in the accessory box remove the shipping restraints 3 To remove the two front shipping restraints follow these steps a Ope...

Страница 53: ...the cable tie that holds the X axis in place See Figure 3 12 Lift the X axis with the help of an assistant and hold it aloft so the shipping rstraint is visible as shown in figure Figure 3 12 Shippin...

Страница 54: ...re are two on either side See Figure 3 13 XLS 89000 XLS 85000 Shipping restraint right side Shipping restraint right side Shipping restraint left side Shipping restraint left side Figure 3 13 Location...

Страница 55: ...its intended location WARNING To avoid injury or equipment damage use three or more people when rolling the equipment to its final location 3 Unpack the tape drives the equipment rack and all accesso...

Страница 56: ...f scissors cut and remove the two nylon bands securing the crate to the pallet See Figure 3 17 Figure 3 15 Equipment rack in wooden crate 2 Using a Phillips screwdriver remove the drywall screws that...

Страница 57: ...f an assistant lift the equipment rack out of the crate and carefully set it down 6 Remove the plastic bag from the equipment rack and save all of the packaging material in case any of the equipment n...

Страница 58: ...3 3 Unpacking the Equipment Rack 3 16 501601 Rev 07 01 19 Notes...

Страница 59: ...cutters or scissors Procedure overview After you have unpacked the LRM and moved it to its intended installation location installing the LRM involves the following steps Removing the shipment locks on...

Страница 60: ...and remove the cable tie that holds the gripper head in place See Figure 4 1 Cable tie Figure 4 1 Location of cable tie securing the gripper head 3 Cut and remove the cable tie that holds the X axis i...

Страница 61: ...asing a jam nut 3 Using the same wrench extend the leveling foot until it touches the floor Then turn the nut two more complete turns See Figure 4 4 1 Lower the foot to the floor 2 Turn the nut 2 more...

Страница 62: ...nstalling a MEM turn all four jam nuts clockwise until they push up against the frame See Figure 4 5 Turn jam nut until it pushes against the frame Figure 4 5 Tightening a leveling foot 4 4 Releasing...

Страница 63: ...on the top of the LRM 2 Use a 3 8 inch Allen wrench to remove the four screws 3 Store the screws in the four holes in the top of the LRM See Figure 4 6 Important Be sure to store the screws in the top...

Страница 64: ...4 4 Releasing the Carousel Locks in a XLS 8161100 4 6 501601 Rev 07 01 19 Notes...

Страница 65: ...on 5 2 on page 5 3 3 Releasing the carousel locks Section 5 3 on page 5 5 4 Connecting the carousel controller cable Section 5 5 on page 5 9 5 Attaching the MEM to the LRM Section 5 6 on page 5 11 6 L...

Страница 66: ...t the base of the side panel 2 Using a 2 Phillips screwdriver remove the two screws See Figure 5 1 Figure 5 1 Removing the screws from the side panel 3 Carefully slide the panel up until you can lift...

Страница 67: ...LRM XLS 832700 shown 6 Cut the tie wraps holding the cable to the frame 5 2 Removing the X Axis Hard Stop When shipped the X axis horizontal axis on the handler includes two inner and two outer hard s...

Страница 68: ...stall the MEM CAUTION To avoid damage to the equipment never remove the two outer stops To remove an inner hard stop follow these steps 1 If you will install a MEM to the left of the LRM locate the in...

Страница 69: ...for shipping You must release the carousel locks before installing the MEM To release the carousel locks follow these steps 1 On the right and left sides of the MEM locate the brackets under the caro...

Страница 70: ...ionary PEM nut and function to raise and lower the carousel The screws on the right side of the bracket screws 3 and 4 in Figure 5 7 are shipping locks that keep the carousel from rotating 3 Use a 5 1...

Страница 71: ...service use 5 Turn the carousel by hand to ensure that it rotates smoothly and without encountering any obstructions The carousel will be hard to turn CAUTION Do not use the edges of the cartridge sl...

Страница 72: ...of the carousel lock screws on the top of the MEM 2 Use a 3 8 inch Allen wrench to remove screws 1 and 4 as shown in Figure 5 9 3 Gradually remove screws 2 and 3 as follows a Loosen screw 2 a few turn...

Страница 73: ...carousel by hand to ensure that it rotates smoothly and without encountering any obstructions The carousel will be hard to turn CAUTION Do not use the edges of the cartridge slots to turn the carousel...

Страница 74: ...anel are shorter than the other six See Figure 5 11 XLS 89000 XLS 85000 Figure 5 11 Removing the MEM s lower back panel 2 Route the cable as follows Out the side of the LRM Into the side of the MEM Ou...

Страница 75: ...gure 5 13 Inserting an alignment pin into the MEM upper hole shown 3 Confirm that the pins on the MEM align with the holes on the LRM Important If the pins do not align with the holes adjust the level...

Страница 76: ...M to the LRM 8 From the MEM accessory kit obtain six 5 16 x 1 2 inch socket head screws and washers 9 Insert the screws through their washers and into the holes 10 Tighten the screws with a 1 4 inch A...

Страница 77: ...nut to loosen leveling foot Figure 5 15 Loosening a leveling foot 3 Using the same wrench extend the leveling foot until it touches the floor Then turn the nut two more complete turns See Figure 5 16...

Страница 78: ...revent the carousel from sagging when it is loaded with cartridges These supports must be tight against the floor before you install the cartridges CAUTION To avoid damaging the base of the carousel d...

Страница 79: ...s 1 Holding the side panel with both hands place the panel next to the MEM and carefully lower it until the hooks on the panel engage with the corresponding slots on the MEM s frame 2 Insert the two s...

Страница 80: ...5 9 Installing the Side Panel on the MEM 5 16 501601 Rev 07 01 19 Notes...

Страница 81: ...pansion pod Step Task Refer to 1 Remove the side panels from the XLS 812300 Section 6 1 on page 6 2 2 Install the expansion pod mounting hardware Section 6 2 on page 6 5 3 Remove the X axis hard stop...

Страница 82: ...ket head screws 3 5 16 flat washers 3 Left expansion pod 3 8 16 x 1 2 socket head screws 3 3 8 flat washers 3 6 1 Removing the Side Panels from the XLS 812300 To remove the side panels from the XLS 81...

Страница 83: ...the corresponding slots on the frame See Figure 6 2 Figure 6 2 Removing the front side panel 4 Repeat steps 2 and 3 to remove the rear side panel 5 Use a T20 Torx driver to remove the five screws tha...

Страница 84: ...12300 6 4 501601 Rev 07 01 19 6 Using a 2 Phillips screwdriver remove the six screws that attach the center mounting rail to the side of the XLS 812300 See Figure 6 3 Figure 6 3 Removing the center mo...

Страница 85: ...r cable See Figure 6 4 Figure 6 4 Expansion pod controller cable on the side of the XLS 812300 2 Cut the cable ties holding the cable to the frame 3 In the accessory kit for the expansion pod locate t...

Страница 86: ...Insert the bullet nose end of the alignment pin into the hole at the top of the XLS 812300 6 Secure the top hinge mount using three flat head screws Ensure that the hinge pins point upward See Figure...

Страница 87: ...gh the channel on the bottom hinge mount See Figure 6 7 Figure 6 7 Routing the expansion pod controller cable through the bottom hinge mount 8 Attach the bottom hinge mount to the XLS 812300 using one...

Страница 88: ...is to the left of the XLS 812300 Use three 3 8 x 1 2 socket head screws and three 3 8 inch flat washers Install the screws from the inside of the XLS That is insert them into the XLS frame then into t...

Страница 89: ...ed the handler is prevented from traveling too far to the left and right When an inner hard stop is removed the handler can reach into an attached expansion pod You need to remove the inner hard stop...

Страница 90: ...er hard stop from the X axis See Figure 6 11 Do not remove Figure 6 11 Removing the X axis hard stop right side shown 6 4 Attaching the Expansion Pod to the XLS 812300 To attach the expansion pod to t...

Страница 91: ...300 into the corresponding holes on the pod See Figure 6 12 Figure 6 12 Attaching an expansion pod left side shown with fixed port removed 3 Connect the expansion pod controller cable to the keyed con...

Страница 92: ...gure 6 14 Top hole Top alignment pin Figure 6 14 Aligning the expansion pod with the XLS 812300 5 Insert three 10 32 x 1 1 4 socket head screws through the three holes on the outside of the expansion...

Страница 93: ...See Figure 6 16 for the location of the three top screws Figure 6 16 Installing the side panel on the expansion pod 2 Insert one screw in the hole at the bottom of the panel Using a 2 Phillips screwd...

Страница 94: ...6 5 Reinstalling the Rear Side Panel 6 14 501601 Rev 07 01 19 Notes...

Страница 95: ...ght of the equipment installed in the optional equipment rack should not exceed 120lbs 54 4kg Equipment rack Figure 7 1 Back of XLS 832700 with the optional equipment rack installed To install the rac...

Страница 96: ...LS does not fit through a 36 inch door Do not install the mounting hardware for the 8U rack until after the XLS is in its final location Required tools Obtain the following 2 Phillips screwdriver 3 16...

Страница 97: ...inserting the bracket s tab into the slot on the frame 2 Secure the bracket with three 6 32 Phillips screws as shown in Figure 7 2 Insert screws Figure 7 2 Bottom left equipment rack bracket 3 Attach...

Страница 98: ...e frame as shown in Figure 7 3 Insert screws Figure 7 3 Securing the extension block to the frame b Tighten the screws c Use two 6 32 Phillips screws to attach the left bottom bracket to the bottom of...

Страница 99: ...left equipment rack bracket 6 Attach the second upper bracket to the top right side of the frame 7 Once the 8U rack hardware is installed refer to Section 7 2 to install the rack 7 2 Installing the R...

Страница 100: ...gure 7 6 Guide rails Hinge latches Figure 7 6 Guide rails and hinge latches 2 With the latches to the front lift the empty rack into the rack space on the back of the XLS To avoid scraping the XLS s m...

Страница 101: ...p left hinge latch See Figure 7 8 Figure 7 8 Inserting the hinge latches into the frame 4 Release the latches into the holes on the frame CAUTION Ensure that both latches have fully released and that...

Страница 102: ...the right side of the rack CAUTION To avoid equipment damage do not install hardware into the rack unless both lanyards are attached to the frame 8 Secure the rack in place by inserting the right hin...

Страница 103: ...btain the following 2 Phillips screwdriver Required equipment Make sure you have the following included with the rack Two slide assemblies Ten 8 32 1 4 Phillips screws Power cord Equipment rack Figure...

Страница 104: ...shown 2 Attach the other slide assembly to the left side of the frame using the remaining five 8 32 1 4 Phillips screws 3 Pull both slide assemblies out of the frame until they are fully extended and...

Страница 105: ...assembly locking arm Slide rails on rack Figure 7 12 Slide assembly locking arm 6 Press the locking arms on both slide assemblies to release the locks and then slide the rack all the way back into th...

Страница 106: ...the 8U rack Sixteen 10 32 1 2 Phillips screws included with the rack One to seven cosmetic covers included with the rack 7 4 1 Installing the power strip and rack equipment into the XLS 832700 Follow...

Страница 107: ...ng a Phillips screwdriver secure each plate with 10 32 screws at the top and bottom See Figure 7 14 Rack equipment Cosmetic cover Figure 7 14 Rack equipment and cosmetic covers 8U rack shown 5 Secure...

Страница 108: ...r the power strip right side of frame shown 7 Connect power cords between any installed equipment and the power strip 8 When appropriate connect the power strip to the input power source and power on...

Страница 109: ...t damage the total weight of the equipment installed in the optional equipment rack should not exceed 120lbs 54 4kg 4 As required install cosmetic covers over any unused positions in the rack Using a...

Страница 110: ...nected to the power strip 9 Guide the power cord through the slot in the door then close the door making sure the cord is not pinched 10 Turn the thumb screw clockwise until hand tight to secure the d...

Страница 111: ...17 2 Release the two hinge latches on the left or the two hinges on the right CAUTION Never release all four hinge latches unless you are removing an empty rack To access the rack equipment in the XL...

Страница 112: ...7 5 Accessing Rack Equipment 7 18 501601 Rev 07 01 19 Notes...

Страница 113: ...anty do not attempt to remove the tape drives from the drive carriers The tape drives used in the XLS must be installed into drive carriers at the factory When it is shipped the XLS includes one to ei...

Страница 114: ...r safety and UL compliance a drive filler assembly see Figure 8 3 must be installed in any unused tape drive slot If there are empty tape drive slots the handler will be prevented from moving when pow...

Страница 115: ...e communication protocols used by the tape drives and the medium changer do not need to be the same A logical library can contain Fibre Channel tape drives and a SCSI HBA or a SCSI tape drive and Fibr...

Страница 116: ...ontains one LTO4 SCSI tape drive The software application in the host computer communicates with the tape drive and the medium changer over two seperate SCSI buses The LTO4 SCSI tape drive carrier is...

Страница 117: ...es They could also contain SCSI or Fibre Channel tape drives connected to other logical libraries to SCSI host Log Library 2 to SCSI host Log Library 1 Blank Drive Cover Blank Drive Cover to SCSI host...

Страница 118: ...edium changer using the lower port of HBA A Logical Library 3 contains four tape drives in a single drive bay The host software controls the medium changer using the upper port of HBA B The tape drive...

Страница 119: ...over two seperate SCSI buses The LTO4 SCSI tape drive carrier is self terinating and the other end is terminated by the host computer The lower port of HBA A in the system controller which provides a...

Страница 120: ...SCSI host Log Library 1 Blank Drive Cover Blank Drive Cover to FC switch Log Library 3 Log Lib 1 SCSI Log Lib 2 SCSI Log Lib 3 FC Log Lib 4 FC A B C D to FC switch Log Library 4 to SCSI host Log Libra...

Страница 121: ...e back of the LRM In the example Host 1 is connected to one of the HBA ports in the system controller and it controls the medium changer interface for the logical library Hosts 2 3 and 4 share access...

Страница 122: ...as follows Logical Library 1 includes a single SCSI tape drive in bay position 1F Logical Library 2 includes a single SCSI tape drive in bay position 2F Logical Library 3 includes five Fibre Channel...

Страница 123: ...2E Drive type Interface Serial No Log Lib Bay position 1E Drive type Interface Serial No Log Lib Bay position 4D Drive type Interface Serial No Log Lib Bay position 3D Drive type Interface Serial No...

Страница 124: ...to Before You Begin on page 8 2 to determine where to install each tape drive or drive filler assembly 2 Using one hand to support the tape drive s weight at the front of the carrier carefully slide t...

Страница 125: ...screws 5 Repeat steps 2 4 to install all of the tape drive assemblies 6 As required repeat steps 2 4 to install drive filler assemblies shown in Figure 8 3 on page 8 2 in any unused positions CAUTION...

Страница 126: ...8 2 Installing Tape Drive and Drive Filler Assemblies 8 14 501601 Rev 07 01 19 Notes...

Страница 127: ...ibre Channel tape drive and HBA to the Fibre Channel switch The tape drives and the HBAs in the XLS both use multimode 62 5 125 fiber optic patch cables with duplex LC connectors For SCSI installation...

Страница 128: ...changer and the tape drives in a number of ways using parallel SCSI buses Fibre Channel networks or a combination of both The communication protocol is determined by the type of host bus adapter card...

Страница 129: ...re 9 2 Example of multiple SCSI and Fibre Channel HBA connections Connecting SCSI Cables and Terminators To connect LTO3 tape drive SCSI cables and terminators follow these steps 1 Connect one or more...

Страница 130: ...ps 1 Connect the HBA as follows a Route an external SCSI cable through the appropriate slot on the back of the system controller b Attach the cable to a port on a SCSI HBA If multiple SCSI and Fibre C...

Страница 131: ...Fibre Channel connectors on each tape drive 2 Connect the HBA as follows a Route an optical cable through the appropriate slot on the back of the system controller b Attach the cable to a port on a Fi...

Страница 132: ...9 2 3 Replace the EMI Shield After connecting the cables replace the EMI shield and tighten the two thumb screws Important To avoid potential problems caused by electromagnetic interference do not op...

Страница 133: ...s ready Follow these steps 1 Make sure you have a power cord suitable for your input voltage and location see the XLS Library Product Specification 2 If you plan to connect the XLS to a UPS obtain the...

Страница 134: ...adequate to support the number of installed drive bays and attached MEMs CAUTION To avoid tripping the circuit breaker either at the library or at the main circuit panel ensure the input power is ade...

Страница 135: ...ources providing a redundant power source in the event one of the power sources should fail The unit powers the load from the first power input normally The unit switches to the second power input if...

Страница 136: ...utlet 4 If you plan to use a UPS follow these steps a Connect the UPS cable UPS Communication Cable Smart Signaling to the serial port on the XLS b Connect the UPS cable to the UPS c Connect the UPS s...

Страница 137: ...Power and Logging Into X Link XLS Library Installation Manual 10 5 5 Move the power switch to the on position See Figure 10 3 Figure 10 3 Power switch in on position 6 Wait for the power on processes...

Страница 138: ...e 10 4 Location of the power switches and power connectors 2 If the power cord restraint is attached loosen the captive screws and remove the restraint to access the power connectors 3 Connect one of...

Страница 139: ...oth of the power switches to the on position See Figure 10 6 Figure 10 6 Power switches in the on position 7 Wait for the power on processes to complete During power on The status LEDs on the front pa...

Страница 140: ...library look at each power supply and confirm that the PWR Good LED is green and the Fault LED is off See Figure 10 9 on page 10 11 3 Rule out common explanations for a power on failure See Table 10 1...

Страница 141: ...axis not removed If you are using one or more MEMs make sure that the inner hard stop on the handler s X axis has been removed allowing the handler to reach into the MEM Battery module not charged If...

Страница 142: ...ot implemented Library Activity Steady green The XLS is powered on and in an error free state currently not implemented Robot Activity Flashing green The handler or the carousel is moving Fault Flashi...

Страница 143: ...ot connected to a Fibre Channel switch or a link is not established Green The tape drive is connected to an active Fibre Channel switch and a link is established Activity Fibre Channel carrier only Of...

Страница 144: ...failed and needs to be replaced or the library is powered down Table 10 4 Meaning of the power supply status LEDs 10 3 Logging Into X Link Figure 10 10 shows the X Link log in page You can log into X...

Страница 145: ...of the log in page The virtual keyboard opens as shown in Figure 10 11 Note that a stylus has been included with the accessory kit that can be used to control the touch screen Please be sure to only u...

Страница 146: ...uch screen press Next on the virtual keyboard to display the Password field 4 Type your password in the Password field 5 If you are using the touch screen press Close on the virtual keyboard to return...

Страница 147: ...e MEMs or expansion pods are installed aligning the gripper to the extra slots See Section 11 2 on page 11 5 Verifying the hardware configuration See Section 11 4 on page 11 23 Entering basic informat...

Страница 148: ...on of the primary Ethernet connector The secondary Ethernet connector the service port is intended for local service operations with a laptop or other standalone computer The service port for the XLS...

Страница 149: ...er if you allow cookies for the session only any changes you make to the Home page layout will be lost as soon as you log out A CAT5e or better straight through Ethernet cable 11 1 1 Connecting to a N...

Страница 150: ...ngs IP address 192 168 0 245 Subnet mask 255 255 255 0 2 Insert one end of the Ethernet cable into the service port ENET 1 Note The service port for the XLS 8161100 amd XLS 832700 is located behind th...

Страница 151: ...in Theta Position TPOS and X Position XPOS values see Section 11 2 1 Updating the gripper alignment see Section 11 2 3 on page 11 9 Note If your XLS does not include a MEM skip this section and go to...

Страница 152: ...Select Service View to display the Service portlet shown in Figure 11 6 Figure 11 6 Service portlet 4 From the Change Configuration section of the Service portlet select Hardware Configuration The Har...

Страница 153: ...Figure 11 7 Hardware Configuration 5 From the Robot section select Position Robot which homes all axes including any carousels and positions the gripper to an easily accessible location 6 Open all doo...

Страница 154: ...ove the X beam by hand and until the gripper assembly is just under the gripper alignment cartridge Important Make sure the alignment cartridge aligns with the gripper assembly guide rod and that it i...

Страница 155: ...n pod as follows In the Theta 1 field enter the TPOS value for the MEM In the X 1 field enter the XPOS value for the MEM 5 Press Update Alignment When you press this button the XLS updates the gripper...

Страница 156: ...brary and switch the power switch to off 2 Open the LRM door closet to the pod to be calibrated 3 Expansion pod columns are designated A as the front column the column closest to the front of the libr...

Страница 157: ...11 5 If only one expansion POD is used it should be installed on the right side of the LRM Column B Column A Figure 11 10 Column A and B locations in an expansion pod 6 Insert the four pod calibration...

Страница 158: ...slot slot 60 and the FIFTH slot from the bottom NOT the bottom most slot Slot B 60 Slot A 60 Slot B 5 Slot A 5 Figure 11 11 Correct locations for the pod calibration cartridges in columns A and B 7 M...

Страница 159: ...were installed remove both inner hard stops on the left and right side of the X beam Inner hard stop Outer hard stop Figure 11 12 Outer and inner hard stops on the handler s X axis right side shown CA...

Страница 160: ...Calibrating an Expansion Pod Equipped Library 11 14 501601 Rev 07 01 19 12 From the X link home page select Service View to display the Service portlet as shown in Figure 11 13 Figure 11 13 Service po...

Страница 161: ...e 11 14 Figure 11 14 Hardware Configuration 14 Close the XLS Tape Library door s but do not lock them 15 From the Robot section select Position Robot which homes all axes and positions the gripper to...

Страница 162: ...X Beam by hand until the gripper assembly is touching the bottom of the Gripper Alignment Cartridge Figure 11 15 Gripper alignment cartridge seated on the gripper assembly Note Make sure the gripper...

Страница 163: ...e Theta yaw Table 11 1 Measured values for right side expansion pod 9 Push the Y axis down and remove the Gripper Alignment Cartridge from slot 30 column A A 30 10 Insert the Gripper Alignment Cartrid...

Страница 164: ...the Theta position values for each column and find the average value 3 Record the average value for each X and Theta position in the tables for both A and B columns 11 3 5 Measure Other Needed Values...

Страница 165: ...ry 10 Move the X beam by hand until the gripper assembly is just under the gripper alignment cartridge Note Make sure the gripper alignment cartridge is aligned with the gripper assembly guide rod Ple...

Страница 166: ...Expansion Pod Equipped Library 11 20 501601 Rev 07 01 19 11 3 6 Hardware Configuration 1 From the X link home page select ServiceView to display the Service portlet as shown in Figure 11 16 Figure 11...

Страница 167: ...opens as shown in Figure 11 17 Figure 11 17 Hardware Configuration 3 Under the Carousels Pods section select Pod2 from the appropriate drop down list Carousel Pod installed on left or Carousel Pod ins...

Страница 168: ...on to regenerate all databases and update the alignment values 10 Once the new databases are generated please verify that the following message appears in the report database generation phase complete...

Страница 169: ...ansion pods When you first install the XLS you should review the hardware configuration in X Link and verify that it matches the hardware you actually have installed This step is especially important...

Страница 170: ...on Make sure that the cartridge and drive bays are shown in their correct positions 5 In the Doors section of the page review the information displayed for the left and right doors Make sure the corre...

Страница 171: ...iguration and wait while the XLS updates its hardware configuration database The revised database ensures that it will attempt to scan only those resources that are actually installed 9 If the hardwar...

Страница 172: ...Fields on the Configuration portlet 11 5 2 Entering the Network Configuration This section describes how to view and edit the physical library s network configuration which includes the library host n...

Страница 173: ...ame will be displayed in X Link but you must update the dynamic domain name system DNS on your network to make the library name available to the network 4 As required enter information for the IP Addr...

Страница 174: ...not use this information If you want the contacts listed to receive e mail or pager alerts be sure to define them as library users See the XLS Library User s Guide for more information To view or edi...

Страница 175: ...r listed to have permission to perform administrator tasks you must define him or her as a library user and assign him or her to the appropriate user group Refer to the XLS Library User s Guide for mo...

Страница 176: ...ange the password for the default user as described in this section To change the administrator password follow these steps 1 If necessary press the Home button in the upper right corner of any page t...

Страница 177: ...pens as shown in Figure 11 26 Figure 11 26 Change User Password page 7 Enter and re enter the new password Passwords Are case sensitive Must contain between 6 and 32 characters May contain alphabetic...

Страница 178: ...A B C D HBAs Table 11 4 summarizes the ranges and default values for the target IDs Type of interface Target ID range Default setting Fibre Channel 0 to 125 Library HBA port 0 Tape drive 4 3 2 or 1 S...

Страница 179: ...t shown in Figure 11 28 Figure 11 28 Configuration portlet 3 Select View Edit HBA Target ID The View Edit HBA Target ID page opens as shown in Figure 11 29 Figure 11 29 View Edit HBA Target ID page 4...

Страница 180: ...down list select a new target ID for the HBA port 6 Press Save HBA Target ID to save the information The new target ID takes effect as soon as the confirmation page appears Editing Tape Drive Target...

Страница 181: ...ect the location of the tape drive within the drive bay where 1 is the rightmost position and 4 is the leftmost position when the library is viewed from the back c From the Row drop down list select t...

Страница 182: ...e the following which are available from the Settings Policies portlet E mail settings see Section 11 6 2 on page 11 37 SNMP settings see Section 11 6 3 on page 11 39 Event log settings see Section 11...

Страница 183: ...ts follow these steps to ensure that individual users can receive the alerts Enable e mail and pager alerts for the user groups Enable e mail or pager addresses for the user Set the Event Severity to...

Страница 184: ...that is to appear as the sender of the e mail alerts for example Qualstar XLS Library Sender E mail Address The e mail address to which e mail recipients can respond for example XLS Administrator you...

Страница 185: ...1 36 2 Select View Edit SNMP Settings The View Edit SNMP Settings page opens as shown in Figure 11 34 Figure 11 34 View Edit SNMP Settings page 3 Enter a name for the SNMP community in the Community N...

Страница 186: ...more events in the log than this number the library deletes the oldest event 4 In the Save events for field enter the number of hours days or weeks to save events for Then select hours days or weeks...

Страница 187: ...ou may want to adjust this time to ensure optimum read and write reliability in your operating environment 4 In the Minutes before Logging Off Idle Users field specify the maximum number of minutes th...

Страница 188: ...es 11 42 501601 Rev 07 01 19 6 From the Event Severity to Page drop down list select a severity level The XLS sends pager alerts to specified recipients when events of this severity level or above occ...

Страница 189: ...changer interface on a first come first served basis Figure 12 1 on page 12 2 depicts an example XLS configuration that shows the high level relationship between the physical library the logical libra...

Страница 190: ...tape drives independently of the medium changer Physical Library Logical Library 2 Resources owned by Logical Library 1 Logical Library 1 Logical Library 3 Resources owned by Logical Library 2 Resour...

Страница 191: ...schemes these more complex configurations are beyond the scope of this manual If you require a specialized configuration work with your system integrator and software vendor 12 2 Creating a New Logica...

Страница 192: ...an contain 5 to 32 letters and numbers It cannot contain blanks 2 The operating mode for the logical library for software compatibility 3 Whether barcode labels are required on every cartridge and whe...

Страница 193: ...ibrary definitions later on As you create the worksheet refer to the explanations in Section 12 2 3 on page 12 6 to learn the possible values for each option Option Total Available Log Lib 1 Log Lib 2...

Страница 194: ...w many XLS resources are unassigned cartridge slots tape drives and I O ports You can select from these resources when you define the new logical library Important If fewer slots I O ports or tape dri...

Страница 195: ...is checked c In the Barcode labels required field indicate whether barcode labels are required in this logical library The default setting is yes option box checked If you clear the Barcode labels req...

Страница 196: ...ant to allocate to this logical library Specify a value that is equal to or smaller than the number of available slots Important If you anticipate wanting to add storage slots to the logical library i...

Страница 197: ...ating the logical library When you press Next Step the second Create Logical Library page opens as shown in Figure 12 5 Figure 12 5 Create Logical Library page step 2 of 3 6 Enter the name and user ID...

Страница 198: ...ndary contacts are typically responsible for the department or division that owns any data stored on the logical library Important The information listed for the Primary and Secondary Contact Informat...

Страница 199: ...a logical library follow these steps 1 Access the Logical Libraries portlet as described in Section 12 2 1 on page 12 3 2 Select the radio button to the left of the logical library name then select V...

Страница 200: ...r all three slot types at once by selecting the appropriate drop down lists The report automatically updates when the drop down lists are changed 6 To export the inventory report press Excel XML or CS...

Страница 201: ...ollows 4 The element contains a cartridge 5 The element is empty Bar Code If the element contains a cartridge the identifier on its barcode label Action Lists a variety of operations that can be perfo...

Страница 202: ...12 3 Viewing the Inventory Report 12 14 501601 Rev 07 01 19 Notes...

Страница 203: ...ata and cleaning cartridges see Section 13 4 on page 13 5 Important You can also install cartridge using the I O ports For instructions refer to the chapter on importing and exporting cartridges in th...

Страница 204: ...to day tape drive cleaning operations and are installed in locations that are inaccessible to the software applications Procedure To install cartridges into the five reserved slots follow these steps...

Страница 205: ...50 or A50 in XLS 8161100 models Do not install any other type of cartridge in this position 4 Insert at least one new cleaning cartridge into the four slots directly below the calibration cartridges s...

Страница 206: ...lectric motors or medical imaging equipment Never apply adhesive labels to the cartridge anywhere except in the recess provided on the front Labels applied elsewhere could cause the cartridge to becom...

Страница 207: ...ng locations Cartridge bays Depending on the model the XLS can accommodate as many as seven cartridge bays which are interchangeable with drive bays Each cartridge bay provides storage slots for 30 ca...

Страница 208: ...n page 12 11 2 Open the library doors Important The library s power can remain on when you insert the cartridges 3 Refer to the labels within the library or to the figures in Appendix A Library Addres...

Страница 209: ...e XLS 2 Check the cartridge slots to ensure that all cartridges are fully inserted in the slots and that none of the tapes are protruding 3 Check the tape drives to ensure that they do not contain car...

Страница 210: ...ion of each I O port cartridge slot and tape drive When you perform a fidicual scan the XLS moves the handler to each cartridge magazine and I O port and attempts to locate the fiducial targets shown...

Страница 211: ...rvice portlet select Hardware Configuration The Hardware Configuration page opens as shown in Figure 14 4 on page 14 4 5 If the Enter Service Password screen appears see Figure 14 3 enter the appropro...

Страница 212: ...ion to put the XLS into physical mode 7 From the Fiducials section of the page select Home Robot to home the robot on all axes 8 Select I O Ports from the Fiducials section of the page to scan the fid...

Страница 213: ...es the calibration cartridge from slot G50 and inserts it into each tape drive 11 When the tape drive calibration has completed select Dump Database from the Fiducials section of the page The results...

Страница 214: ...mportant Depending on the number of magazines in your library scanning all slots can take several hours 3 Wait while the handler scans the barcode label on each cartridge then select Sync Inventory to...

Страница 215: ...allation Manual 14 7 6 Refer to Section 12 3 Viewing the Inventory Report on page 12 11 to generate a new report of cartridges for each logical library You can compare this report to the previous one...

Страница 216: ...14 3 Scanning the Inventory and Locking the Doors 14 8 501601 Rev 07 01 19 Notes...

Страница 217: ...putting the XLS in logical mode in preparation for bringing the logical libraries online In logical mode one or more software applications control the library and you interact with X Link from a logi...

Страница 218: ...simplify the process of finding and correcting installation errors bring the logical libraries online one at a time Make sure that each logical library is working correctly before bringing any other...

Страница 219: ...e 15 2 Figure 15 2 Bring Library Online page 4 Press Yes to confirm that you want to bring the library online 15 3 Starting the Application After bringing the logical library online start the backup s...

Страница 220: ...are application to determine if there are any special requirements for setting target IDs HBA connections Make sure that the SCSI or Fibre Channel cable is connected to the HBA port you specified when...

Страница 221: ...stem controller fails or if you want to return to your initial configuration See the XLS Technical Service Manual for instructions CAUTION Whenever you make changes to the system configuration be sure...

Страница 222: ...tion page opens as shown in Figure 15 4 indicating that zipped configuration files are ready to be downloaded Figure 15 4 Download Configuration page 4 Press Download Now A File Download window simila...

Страница 223: ...a Save As window 6 Specify a destination folder for the configuration file and press Save 7 When you have successfully downloaded the zipped configuration file press Done to return to the Home page 8...

Страница 224: ...15 5 Downloading the Library Configuration 15 8 501601 Rev 07 01 19 Notes...

Страница 225: ...viewed from the back Figure A 3 on page A 5 XLS 832700 All cartridge slots on the rear wall and the optional door slots Figure A 4 on page A 6 The rear wall assuming that drive bays are installed inst...

Страница 226: ...01 19 Model For physical addresses of Refer to MEMs The cartridge slots on the carousel XLS 832700 and XLS 820500 Figure A 17 on page A 18 and Figure A 18 on page A 19 Table A 1 Physical addresses for...

Страница 227: ...1 A10 A09 A08 A07 A06 A05 A04 A03 A02 A01 A 1 Addresses for the XLS 8161100 Figure A 1 shows the physical addresses for the rear wall carousels and the optional door slots of the XLS 8161100 The figur...

Страница 228: ...nt E26 through E60 F26 through F60 D26 through D60 E26 through E60 F26 through F60 D26 through D60 G26 through G60 G26 through G60 C26 through C60 Left Side Carousel H26 through H60 Right Side Carouse...

Страница 229: ...D 3D 2D 1D 4C 3C 2C 1C 4B 3B 2B 1B 4A 3A 2A 1A Figure A 3 shows the physical addresses of the tape drives in the XLS 8161100 as viewed from the back 4 3 2 1 D C B A Figure A 3 Physical addresses for t...

Страница 230: ...8 F08 G08 B07 C07 D07 E07 F07 G07 B06 C06 D06 E06 F06 G06 B05 C05 D05 E05 F05 G05 B04 C04 D04 E04 F04 G04 B03 C03 D03 E03 F03 G03 B02 C02 D02 E02 F02 G02 B01 C01 D01 E01 F01 G01 A60 A59 A58 A57 A56 A5...

Страница 231: ...3 A12 A11 A10 A09 A08 A07 A06 A05 A04 A03 A02 A01 1H 2H 3H 4H 1G 2G 3G 4G 1F 2F 3F 4F 1E 2E 3E 4E 1D 2D 3D 4D 1C 2C 3C 4C 1B 2B 3B 4B 1A 2A 3A 4A Figure A 5 shows the physical addresses for the rear w...

Страница 232: ...the physical addresses of the tape drives in the XLS 832700 as viewed from the back 4H 3H 2H 1H 4G 3G 2G 1G 4F 3F 2F 1F 4E 3E 2E 1E 4D 3D 2D 1D 4C 3C 2C 1C 4B 3B 2B 1B 4A 3A 2A 1A Figure A 6 Physical...

Страница 233: ...09 D09 E09 F09 G09 B08 C08 D08 E08 F08 G08 B07 C07 D07 E07 F07 G07 B06 C06 D06 E06 F06 G06 B05 C05 D05 E05 F05 G05 B04 C04 D04 E04 F04 G04 B03 C03 D03 E03 F03 G03 B02 C02 D02 E02 F02 G02 B01 C01 D01 E...

Страница 234: ...27 D27 E27 F27 G27 B26 C26 D26 E26 F26 G26 1E 2E 3E 4E 1D 2D 3D 4D 1C 2C 3C 4C 1B 2B 3B 4B Figure A 8 shows the physical addresses for the rear wall of the XLS 820500 assuming that five drive bays are...

Страница 235: ...1 Figure A 9 shows the physical addresses of the tape drives in the XLS 820500 as viewed from the back 4E 3E 2E 1E 4D 3D 2D 1D 4C 3C 2C 1C 4B 3B 2B 1B 4A 3A 2A 1A Figure A 9 Physical addresses for the...

Страница 236: ...6 E26 F26 G26 not used for cartridges not used for cartridges not used for cartridges B10 C10 D10 E10 F10 G10 B09 C09 D09 E09 F09 G09 B08 C08 D08 E08 F08 G08 B07 C07 D07 E07 F07 G07 B06 C06 D06 E06 F0...

Страница 237: ...D33 E33 F33 G33 B32 C32 D32 E32 F32 G32 B31 C31 D31 E31 F31 G31 B30 C30 D30 E30 F30 G30 B29 C29 D29 E29 F29 G29 B28 C28 D28 E28 F28 G28 B27 C27 D27 E27 F27 G27 B26 C26 D26 E26 F26 G26 1E 2E 3E 4E 1D 2...

Страница 238: ...07 01 19 Figure A 12 shows the physical addresses of all possible tape drives in the XLS 812300 as viewed from the back 4E 3E 2E 1E 4D 3D 2D 1D 4C 3C 2C 1C Figure A 12 Physical addresses for the tape...

Страница 239: ...A60 B59 A59 B58 A58 B57 A57 B56 A56 B55 A55 B54 A54 B53 A53 B52 A52 B51 A51 B50 A50 B49 A49 B48 A48 B47 A47 B46 A46 B45 A45 B44 A44 B43 A43 B42 A42 B41 A41 B40 A40 B39 A39 B38 A38 B37 A37 B36 A36 B35...

Страница 240: ...and right door slots if installed In this figure the columns are labeled from left to right as if the door s were open Left door slots are available for the XLS 832700 and XLS 8161100 only Left Door...

Страница 241: ...he XLS 812300 can have two I O ports in the upper left and upper right positions only Upper Left Upper Right Lower Left Lower Right Figure A 15 Physical addresses for the I O port slots if installed v...

Страница 242: ...arousel in the Media Expansion Modules MEMs The five slots A46 A50 are reserved for pass through J01 through J60 H01 through H60 K01 through K60 L01 through L60 G01 through G60 F01 through F60 E01 thr...

Страница 243: ...y Installation Manual A 19 E01 through E60 F01 through F60 D01 through D60 C01 through C60 G01 through G60 H01 through H60 Reserved slots A46 A50 Figure A 18 Physical addresses for the slots in an XLS...

Страница 244: ...A 6 Addresses for the Media Expansion Modules MEMs A 20 501601 Rev 07 01 19 Notes...

Страница 245: ...e internal data base of cartridge locations that is maintained by the system controller cartridge slot Any of the locations in the library that can store a cartridge A cartridge slot is referred to as...

Страница 246: ...ement in the SCSI standard HBA Host bus adapter card host bus adapter card HBA A circuit board installed in one of the system controller s four expansion slots that allows the library to attach to and...

Страница 247: ...e read and possibly written using the SNMP protocol Media Expansion Module MEM The auxiliary library module that contains a motor driven carousel with storage for 1 080 cartridges You can connect one...

Страница 248: ...onitored and managed is defined by a MIB The functions supported by the protocol are the request and retrieval of data and the setting or writing of data SMTP Simple Mail Transfer Protocol SNMP Simple...

Страница 249: ...connecting SCSI 9 3 EMI shield 9 2 Ethernet 11 3 Fibre Channel 9 5 calibration defined 1 13 calibration cartridge defined GL 1 installing 13 1 location A 3 A 6 A 9 A 12 when used 1 13 carousel addres...

Страница 250: ...1 EMI shield removing 9 2 equipment rack described 1 19 installing 8U rack hardware 7 2 power strip 7 14 Ethernet connecting to 11 1 defined GL 2 IP address 11 4 event defined GL 2 deleting 11 39 even...

Страница 251: ...logical library See also physical library defined GL 2 powering on 10 1 Library Activity LED 10 10 Library Resource Module LRM 1 1 components and features 1 7 defined GL 3 described 1 7 LEDs 10 10 lig...

Страница 252: ...trip for equipment rack 7 14 power supplies LEDs 10 11 power switch 10 3 PWR Good LED 10 12 Q Qualstar contacting 1 28 R rear wall slots physical addresses A 3 A 6 A 9 A 12 relative humidity cartridge...

Страница 253: ...3 2 touch screen defined GL 4 described 1 11 logging in 10 13 troubleshooting installation problems 15 4 typographic conventions 1 23 X X axis 1 12 X axis hard stop 5 3 6 9 X Link described 1 11 XLS...

Страница 254: ...Index IN 6 501601 Rev 07 01 19...

Отзывы: