Quality Water For Less Fleck 2510 Скачать руководство пользователя страница 6

PAGE 6

QualityWaterForLess.com

Help: 888-426-5001

 

 PPM Hardness 

÷

 17.1 =  

 gpg Hardness before Iron

1   › ca lc u l at I n G   Yo u r   H a r d n es s   l e V e l

1) 

Water test: Before start-up, it is crucial that you know your water’s HardneSS and Iron levels in 

order to set up your unit properly.

 If your unit is not programmed with your particular hardness level, it will 

either regenerate too early or too late. If you do not know your water hardness or iron levels, you can take a 
sample of your untreated water to a local pool shop, hardware store, or well driller 

(city water has no iron)

2) 

Initial Hardness:

 Your Hardness test results may be recorded in Grains per Gallon (gpg), Parts per Million 

(PPM), or Milligrams per Liter (mg/L). Note that 

PPM and mg/l are the same measure

 and both figures can 

be used interchangeably. 

If you get a hardness level in PPM or mg/l, please divide this number by 17.1 

to get Grains (gpg).

 Ex: If your hardness is measured at 300 PPM, take 300 / 17.1 = 18 gpg before iron

3) 

 H - coMPenSated HardneSS: 

 Your Iron results should also be measured in either PPM or mg/L. 

take 

your level of iron multiplied by 5 and add it to the hardness level from the previous step.

 This final figure 

will be your 

compensated Hardness level

 

that we will program into your softener system. Ex: If your iron level 

is measured at 2 PPM, add 2 x 5 = 10 Grains of hardness to existing hardness total. 18 + 10 = 28 Grains Total

4) 

the compensated hardness level you just calculated will be the “H” value you use to program your 

softener. You may record this in the table on page 4 or 5.

 Depending on your compensated hardness 

level, you will be able to use a different salt setting for programming and running your softener unit. The 
lower the hardness level, the more efficient you will be able to be with salt consumption for regeneration

P l a I n 

G r I d

11x11”  G r I d

15 x17 ”  G r I d

18 ”   d I a M e t e r   G r I d

G r I d   + 

3 ”   l e G s

G r I d   + 

6 ”   l e G s

 

 gpg Ha (  

 PPM Iron x 5 ) =  

 gpg 

 H - coMPenSated HardneSS 

Содержание Fleck 2510

Страница 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Страница 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Страница 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Страница 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Страница 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Страница 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Страница 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Страница 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Страница 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Страница 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Страница 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Страница 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Страница 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Страница 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Страница 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Страница 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Страница 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Страница 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Отзывы: