![Qualitrol DGALT1-11120 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/qualitrol/dgalt1-11120/dgalt1-11120_installation-and-user-manual_3413968013.webp)
Installation & User Guide
Monitor Installation
Note:
Do not attempt to install your DGA-LT1 On-Line Transformer Monitor until you have read and fully
understand the procedures outlined in this document.
Installation of the QualConnex system consists of the following:
•
Site Preparation
•
All shipped items have been located
•
Configuration of website
•
Required tools for assembly
•
Assembly and mounting the QGateway with mount
•
QGateway field installation
•
Installing the DGA-LT1
•
Bleeding the DGA-LT1 monitor
•
Commissioning
Items Shipped
Upon receipt of your transformer monitor, it is important to verify the contents of the shipping carton
with the packing list. After inspection of the contents, please notify Qualitrol via our "contact us" page
at
www.qualitrolcorp.com/contact-us/
if there are any missing parts or any signs of damage that may
have occurred in transit. If possible, please retain the original shipping container and packing
materials if it becomes necessary to return the monitor.